ITAC Assessment: MO0287
ITAC logo
ITAC Assessment: MO0287
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Copper and Plastic
NAICS
n/a
SIC 3694: Electrical Equipment for Internal Combustion Engines
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 90,000
ft2
Annual Production 1,693,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,866 3,268,171
kWh
Electricity Demand $47,864 785
kW-mo/yr
Electricity Fees $13,563 -
LPG $6,807 580
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $39,317 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,062 $2,973 $757
16,120
kWh
$305
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $706 $890 $523
11,137
kWh
$183
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $706 $339 $523
11,137
kWh
$183
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $987 $80 $743
15,826
kWh
$244
-
kW-mo/yr
- -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $2,700 - - - $2,700
-
lb
-
06 3.5316: Contract a wood pallet recycling company $1,000 - - - $1,000
-
lb
-
07 4.513: Re-arrange equipment layout to reduce labor costs $19,656 $500 - - - $19,656
08 4.125: $12,500 $6,000 - - - $12,500
TOTAL RECOMMENDED $39,317 $10,782 $2,546
54,220
kWh
$915
-
kW-mo/yr
$3,700
-
lb
$32,156
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs