Assessment Year | 2000 |
---|---|
Principal Product | Copper and Plastic |
NAICS |
n/a
|
SIC | 3694: Electrical Equipment for Internal Combustion Engines |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
90,000
ft2
|
Annual Production | 1,693,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $139,866 | 3,268,171 |
kWh
|
$0.043 |
Electricity Demand | $47,864 | 785 |
kW-mo/yr
|
$60.97 |
Electricity Fees | $13,563 | - |
|
- |
LPG | $6,807 | 580 |
MMBtu
|
$11.74 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,317 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,062 | $2,973 |
$757
16,120
kWh
|
$305
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $706 | $890 |
$523
11,137
kWh
|
$183
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $706 | $339 |
$523
11,137
kWh
|
$183
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $987 | $80 |
$743
15,826
kWh
|
$244
-
kW-mo/yr
|
- | - | |
05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $2,700 | - | - | - |
$2,700
-
lb
|
- | |
06 | 3.5316: Contract a wood pallet recycling company | $1,000 | - | - | - |
$1,000
-
lb
|
- | |
07 | 4.513: Re-arrange equipment layout to reduce labor costs | $19,656 | $500 | - | - | - | $19,656 | |
08 | 4.125: | $12,500 | $6,000 | - | - | - | $12,500 | |
TOTAL RECOMMENDED | $39,317 | $10,782 |
$2,546
54,220
kWh
|
$915
-
kW-mo/yr
|
$3,700
-
lb
|
$32,156 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs