ITAC Assessment: MO0278
ITAC logo
ITAC Assessment: MO0278
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product pickles
NAICS
n/a
SIC 2035: Pickled Fruits and Vegetables, Vegetable Sauces and Seasonings, and Salad Dressings
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 73,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,698 2,223,916
kWh
Electricity Demand $27,503 454
kW-mo/yr
Electricity Fees $(-4,845.0) -
Natural Gas $58,506 14,068
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,217 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,500

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $2,339 $4,745 $1,491
55,393
kWh
$848
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $350 $175 $229
8,499
kWh
$121
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $911 $80 $608
22,567
kWh
$303
-
kW-mo/yr
- -
04 3.5217: Reuse / recycle/ sell paper products $22,500 - - - $22,500
-
lb
-
05 3.5316: Contract a wood pallet recycling company $3,000 - - - $3,000
-
lb
-
06 4.446: Automate finishing process $25,974 $767 - - - $25,974
07 4.445: Install equipment to move product $17,143 $2,100 - - - $17,143
TOTAL RECOMMENDED $72,217 $7,867 $2,328
86,459
kWh
$1,272
-
kW-mo/yr
$25,500
-
lb
$43,117
TOTAL IMPLEMENTED $25,500 - - - $25,500
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs