ITAC Assessment: MO0277
ITAC logo
ITAC Assessment: MO0277
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Wooden Cabinets
NAICS
n/a
SIC 2434: Wood Kitchen Cabinets
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 80,000
ft2
Annual Production 170,352
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $55,079 1,458,675
kWh
Electricity Demand $42,609 523
kW-mo/yr
Electricity Fees $5,604 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,644 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,992

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $810 $1,321 $403
9,672
kWh
$407
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $2,970 $1,937 $1,830
43,962
kWh
$1,140
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $1,346 $439 $695
16,706
kWh
$651
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,192 $200 $622
14,947
kWh
$570
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $688 - $525
12,603
kWh
$163
-
kW-mo/yr
- -
06 2.4314: Use synthetic lubricant $488 $80 $244
5,862
kWh
$244
-
kW-mo/yr
- -
07 3.7198: Reduce / eliminate use of disposable product $690 $600 - - $690
-
lb
-
08 4.453: Reschedule breaks to allow for continuous production $6,500 - - - - $6,500
09 4.611: Begin a practice of predictive / preventative maintenance $9,960 $3,700 - - - $9,960
TOTAL RECOMMENDED $24,644 $8,277 $4,319
103,752
kWh
$3,175
-
kW-mo/yr
$690
-
lb
$16,460
TOTAL IMPLEMENTED $6,992 $4,377 $3,697
88,805
kWh
$2,605
-
kW-mo/yr
$690
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs