| Assessment Year | 2000 |
|---|---|
| Principal Product | Wooden Cabinets |
| NAICS |
n/a
|
| SIC | 2434: Wood Kitchen Cabinets |
| Sales Range | $10 M to 50M |
| # of Employees | 130 |
| Plant Area |
80,000
ft2
|
| Annual Production | 170,352
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $55,079 | 1,458,675 |
kWh
|
$0.038 |
| Electricity Demand | $42,609 | 523 |
kW-mo/yr
|
$81.47 |
| Electricity Fees | $5,604 | - |
|
- |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $24,644 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,992 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $810 | $1,321 |
$403
9,672
kWh
|
$407
-
kW-mo/yr
|
- | - | |
| 02 | 2.4133: Use most efficient type of electric motors | $2,970 | $1,937 |
$1,830
43,962
kWh
|
$1,140
-
kW-mo/yr
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $1,346 | $439 |
$695
16,706
kWh
|
$651
-
kW-mo/yr
|
- | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,192 | $200 |
$622
14,947
kWh
|
$570
-
kW-mo/yr
|
- | - | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $688 | - |
$525
12,603
kWh
|
$163
-
kW-mo/yr
|
- | - | |
| 06 | 2.4314: Use synthetic lubricant | $488 | $80 |
$244
5,862
kWh
|
$244
-
kW-mo/yr
|
- | - | |
| 07 | 3.7198: Reduce / eliminate use of disposable product | $690 | $600 | - | - |
$690
-
lb
|
- | |
| 08 | 4.453: Reschedule breaks to allow for continuous production | $6,500 | - | - | - | - | $6,500 | |
| 09 | 4.611: Begin a practice of predictive / preventative maintenance | $9,960 | $3,700 | - | - | - | $9,960 | |
| TOTAL RECOMMENDED | $24,644 | $8,277 |
$4,319
103,752
kWh
|
$3,175
-
kW-mo/yr
|
$690
-
lb
|
$16,460 | ||
| TOTAL IMPLEMENTED | $6,992 | $4,377 |
$3,697
88,805
kWh
|
$2,605
-
kW-mo/yr
|
$690
-
lb
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs