ITAC Assessment: LT8367
ITAC logo
ITAC Assessment: LT8367
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Treated Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $5
M
to 10
M
# of Employees 6
Plant Area 380,000
ft2
Annual Production 1,123,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Louisiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,100 3,654,560
kWh
Electricity Demand $15,227 6,091
kW-mo/yr
Electricity Fees $87 -
Waste Disposal Costs
Water Usage $52,377 37,955
Tgal
TOTAL YEARLY COSTS $288,791
RECOMMENDED SAVINGS* $64,337 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,344

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Usage Savings
01 3.4113: Treat and reuse rinse waters $53,474 $5,948 $1,186
(-19,597)
kWh
- $52,288
-
Tgal
02 2.6231: Utilize controls to operate equipment only when needed $2,629 $335,972 $2,460
40,657
kWh
$169
-
kW-mo/yr
-
03 2.7111: Reduce illumination to minimum necessary levels $7,506 $3,722 $7,023
116,076
kWh
$484
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $209 $343 $209
3,446
kWh
- -
05 2.7135: Install occupancy sensors $519 $332 $519
8,580
kWh
- -
TOTAL RECOMMENDED $64,337 $346,317 $11,396
149,163
kWh
$653
-
kW-mo/yr
$52,288
-
Tgal
TOTAL IMPLEMENTED $10,344 $340,038 $9,691
160,179
kWh
$653
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs