Assessment Year | 2000 |
---|---|
Principal Product | Chairs and Tables |
NAICS |
n/a
|
SIC | 2499: Wood Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 127 |
Plant Area |
72,400
ft2
|
Annual Production | 72,800
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $29,512 | 894,490 |
kWh
|
$0.033 |
Electricity Demand | $27,602 | 441 |
kW-mo/yr
|
$62.59 |
Electricity Fees | $3,695 | - |
|
- |
LPG | $11,834 | 2,002 |
MMBtu
|
$5.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $12,422 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,165 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $1,643 | $3,595 |
$892
24,033
kWh
|
$751
-
kW-mo/yr
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $544 | $263 |
$294
7,913
kWh
|
$250
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $533 | $40 |
$283
7,620
kWh
|
$250
-
kW-mo/yr
|
- | - | - | |
04 | 2.4314: Use synthetic lubricant | $161 | $160 |
$98
2,638
kWh
|
$63
-
kW-mo/yr
|
- | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $460 | - |
$272
7,327
kWh
|
$188
-
kW-mo/yr
|
- | - | - | |
06 | 3.7198: Reduce / eliminate use of disposable product | $1,194 | $2,160 | - | - | - |
$1,194
-
lb
|
- | |
07 | 3.6124: Burn waste oil for heat | $3,363 | $3,500 | - | - |
$3,363
-
gal
|
- | - | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $4,524 | $1,714 | - | - | - | - | $4,524 | |
TOTAL RECOMMENDED | $12,422 | $11,432 |
$1,839
49,531
kWh
|
$1,502
-
kW-mo/yr
|
$3,363
-
gal
|
$1,194
-
lb
|
$4,524 | ||
TOTAL IMPLEMENTED | $1,165 | $423 |
$664
17,878
kWh
|
$501
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs