Assessment Year | 2000 |
---|---|
Principal Product | Wooden Products |
NAICS |
n/a
|
SIC | 2499: Wood Products, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
60,000
ft2
|
Annual Production | 90,000
ton
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,341 | 1,391,559 |
kWh
|
$0.035 |
Electricity Demand | $49,341 | 427 |
kW-mo/yr
|
$115.55 |
Electricity Fees | $6,446 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,550 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $294 | $553 |
$259
6,448
kWh
|
$35
-
kW-mo/yr
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $421 | $439 |
$247
6,155
kWh
|
$174
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,472 | $200 |
$905
22,567
kWh
|
$567
-
kW-mo/yr
|
- | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $665 | - |
$447
11,137
kWh
|
$218
-
kW-mo/yr
|
- | - | |
05 | 2.4133: Use most efficient type of electric motors | $1,331 | $1,954 |
$1,069
26,671
kWh
|
$262
-
kW-mo/yr
|
- | - | |
06 | 3.6124: Burn waste oil for heat | $967 | $2,600 | - | - |
$967
-
gal
|
- | |
07 | 4.445: Install equipment to move product | $15,505 | $1,300 | - | - | - | $15,505 | |
08 | 4.652: Replace existing equipment with more suitable substitutes | $6,895 | $9,000 | - | - | - | $6,895 | |
TOTAL RECOMMENDED | $27,550 | $16,046 |
$2,927
72,978
kWh
|
$1,256
-
kW-mo/yr
|
$967
-
gal
|
$22,400 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs