ITAC Assessment: MO0275
ITAC logo
ITAC Assessment: MO0275
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Wooden Products
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 60,000
ft2
Annual Production 90,000
ton
Production Hrs. Annual 8,736
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $49,341 1,391,559
kWh
Electricity Demand $49,341 427
kW-mo/yr
Electricity Fees $6,446 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $294 $553 $259
6,448
kWh
$35
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $421 $439 $247
6,155
kWh
$174
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,472 $200 $905
22,567
kWh
$567
-
kW-mo/yr
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $665 - $447
11,137
kWh
$218
-
kW-mo/yr
- -
05 2.4133: Use most efficient type of electric motors $1,331 $1,954 $1,069
26,671
kWh
$262
-
kW-mo/yr
- -
06 3.6124: Burn waste oil for heat $967 $2,600 - - $967
-
gal
-
07 4.445: Install equipment to move product $15,505 $1,300 - - - $15,505
08 4.652: Replace existing equipment with more suitable substitutes $6,895 $9,000 - - - $6,895
TOTAL RECOMMENDED $27,550 $16,046 $2,927
72,978
kWh
$1,256
-
kW-mo/yr
$967
-
gal
$22,400
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs