ITAC Assessment: UU0029
ITAC logo
ITAC Assessment: UU0029
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product recognition awards
NAICS
n/a
SIC 3911: Jewelry, Precious Metal
Sales Range $100
M
to 500
M
# of Employees 160
Plant Area 200,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 3,665
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,294 1,679,280
kWh
Electricity Demand $36,157 4,584
kW-mo/yr
Electricity Fees $16,977 -
Natural Gas $8,754 3,496
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,069 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,710 - - $1,710
-
kW-mo/yr
02 2.3212: Optimize plant power factor $1,000 $1,570 - $1,000
-
kW-mo/yr
03 2.7142: Utilize higher efficiency lamps and/or ballasts $15,840 $8,250 $8,250
254,098
kWh
$7,590
-
kW-mo/yr
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $290 $530 $278
8,584
kWh
$12
-
kW-mo/yr
05 2.7422: Plant trees or shrubs near windows to shield from sunlight $229 $1,650 $104
3,210
kWh
$125
-
kW-mo/yr
TOTAL RECOMMENDED $19,069 $12,000 $8,632
265,892
kWh
$10,437
-
kW-mo/yr
TOTAL IMPLEMENTED $1,000 $1,570 - $1,000
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs