Assessment Year | 2000 |
---|---|
Principal Product | Modular Homes |
NAICS |
n/a
|
SIC | 2452: Prefabricated Wood Buildings and Components |
Sales Range | $10 M to 50M |
# of Employees | 260 |
Plant Area |
149,000
ft2
|
Annual Production | 1,500
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $58,204 | 1,109,906 |
kWh
|
$0.052 |
Electricity Demand | $8,878 | 433 |
kW-mo/yr
|
$20.50 |
Electricity Fees | $9,571 | - |
|
- |
Natural Gas | $46,550 | 7,363 |
MMBtu
|
$6.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $86,805 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $55,473 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,489 | $4,387 |
$1,282
21,102
kWh
|
$207
-
kW-mo/yr
|
- | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $612 | $351 |
$526
8,499
kWh
|
$86
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,007 | $160 |
$866
14,068
kWh
|
$141
-
kW-mo/yr
|
- | - | |
04 | 3.5313: Increase amount of waste recovered for resale | $30,325 | - | - | - |
$30,325
-
lb
|
- | |
05 | 4.445: Install equipment to move product | $26,686 | $5,053 | - | - | - | $26,686 | |
06 | 4.424: Improve space comfort conditioning | $26,686 | $702 | - | - | - | $26,686 | |
TOTAL RECOMMENDED | $86,805 | $10,653 |
$2,674
43,669
kWh
|
$434
-
kW-mo/yr
|
$30,325
-
lb
|
$53,372 | ||
TOTAL IMPLEMENTED | $55,473 | $10,493 |
$1,808
29,601
kWh
|
$293
-
kW-mo/yr
|
- | $53,372 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs