ITAC Assessment: MO0272
ITAC logo
ITAC Assessment: MO0272
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Modular Homes
NAICS
n/a
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $10
M
to 50
M
# of Employees 260
Plant Area 149,000
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,204 1,109,906
kWh
Electricity Demand $8,878 433
kW-mo/yr
Electricity Fees $9,571 -
Natural Gas $46,550 7,363
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $86,805 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,473

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,489 $4,387 $1,282
21,102
kWh
$207
-
kW-mo/yr
- -
02 2.4221: Install compressor air intakes in coolest locations $612 $351 $526
8,499
kWh
$86
-
kW-mo/yr
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,007 $160 $866
14,068
kWh
$141
-
kW-mo/yr
- -
04 3.5313: Increase amount of waste recovered for resale $30,325 - - - $30,325
-
lb
-
05 4.445: Install equipment to move product $26,686 $5,053 - - - $26,686
06 4.424: Improve space comfort conditioning $26,686 $702 - - - $26,686
TOTAL RECOMMENDED $86,805 $10,653 $2,674
43,669
kWh
$434
-
kW-mo/yr
$30,325
-
lb
$53,372
TOTAL IMPLEMENTED $55,473 $10,493 $1,808
29,601
kWh
$293
-
kW-mo/yr
- $53,372
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs