ITAC Assessment: MO0271
ITAC logo
ITAC Assessment: MO0271
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Pharmaceutical Tool and Die
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 125
Plant Area 105,000
ft2
Annual Production 780,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $186,124 3,747,069
kWh
Electricity Demand $20,439 864
kW-mo/yr
Electricity Fees $14,743 -
Natural Gas $11,164 2,571
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,092 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,744

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,098 $3,399 $2,800
52,169
kWh
$298
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $7,238 $9,332 $6,545
122,216
kWh
$693
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $2,506 $175 $2,265
42,204
kWh
$241
-
kW-mo/yr
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,270 $825 $617
11,430
kWh
$653
-
kW-mo/yr
- - -
05 3.7198: Reduce / eliminate use of disposable product $11,232 $2,160 - - $11,232
-
lb
- -
06 3.5315: Lease / purchase baler; sell cardboard to recycler $2,496 - - - $2,496
-
lb
- -
07 4.445: Install equipment to move product $58,989 $7,500 - - - $58,989 -
08 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,263 - - - - - $1,263
TOTAL RECOMMENDED $88,092 $23,391 $12,227
228,019
kWh
$1,885
-
kW-mo/yr
$13,728
-
lb
$58,989 $1,263
TOTAL IMPLEMENTED $9,744 $9,507 $8,810
164,420
kWh
$934
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs