ITAC Assessment: MO0266
ITAC logo
ITAC Assessment: MO0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Automotive Engines
NAICS
n/a
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 148
Plant Area 42,200
ft2
Annual Production 13,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $48,768 1,204,572
kWh
Electricity Demand $23,133 402
kW-mo/yr
Electricity Fees $3,397 -
Natural Gas $34,496 7,559
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,110 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,582

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,430 $3,948 $1,085
25,205
kWh
$345
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $2,291 $97 $1,733
40,152
kWh
$558
-
kW-mo/yr
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,662 $80 $1,259
29,015
kWh
$403
-
kW-mo/yr
- - -
04 2.4133: Use most efficient type of electric motors $1,816 $2,451 $1,373
31,653
kWh
$443
-
kW-mo/yr
- - -
05 3.5316: Contract a wood pallet recycling company $2,475 - - - - $2,475
-
lb
-
06 3.6124: Burn waste oil for heat $4,200 $2,000 - - $4,200
-
gal
- -
07 4.652: Replace existing equipment with more suitable substitutes $15,236 $2,500 - - - - $15,236
TOTAL RECOMMENDED $29,110 $11,076 $5,450
126,025
kWh
$1,749
-
kW-mo/yr
$4,200
-
gal
$2,475
-
lb
$15,236
TOTAL IMPLEMENTED $6,582 $2,548 $3,106
71,805
kWh
$1,001
-
kW-mo/yr
- $2,475
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs