Assessment Year | 1999 |
---|---|
Principal Product | Automotive Engines |
NAICS |
n/a
|
SIC | 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 148 |
Plant Area |
42,200
ft2
|
Annual Production | 13,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $48,768 | 1,204,572 |
kWh
|
$0.040 |
Electricity Demand | $23,133 | 402 |
kW-mo/yr
|
$57.54 |
Electricity Fees | $3,397 | - |
|
- |
Natural Gas | $34,496 | 7,559 |
MMBtu
|
$4.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $29,110 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,582 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,430 | $3,948 |
$1,085
25,205
kWh
|
$345
-
kW-mo/yr
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $2,291 | $97 |
$1,733
40,152
kWh
|
$558
-
kW-mo/yr
|
- | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,662 | $80 |
$1,259
29,015
kWh
|
$403
-
kW-mo/yr
|
- | - | - | |
04 | 2.4133: Use most efficient type of electric motors | $1,816 | $2,451 |
$1,373
31,653
kWh
|
$443
-
kW-mo/yr
|
- | - | - | |
05 | 3.5316: Contract a wood pallet recycling company | $2,475 | - | - | - | - |
$2,475
-
lb
|
- | |
06 | 3.6124: Burn waste oil for heat | $4,200 | $2,000 | - | - |
$4,200
-
gal
|
- | - | |
07 | 4.652: Replace existing equipment with more suitable substitutes | $15,236 | $2,500 | - | - | - | - | $15,236 | |
TOTAL RECOMMENDED | $29,110 | $11,076 |
$5,450
126,025
kWh
|
$1,749
-
kW-mo/yr
|
$4,200
-
gal
|
$2,475
-
lb
|
$15,236 | ||
TOTAL IMPLEMENTED | $6,582 | $2,548 |
$3,106
71,805
kWh
|
$1,001
-
kW-mo/yr
|
- |
$2,475
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs