ITAC Assessment: MO0264
ITAC logo
ITAC Assessment: MO0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Mobile Air Storage Tanks
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 40
Plant Area 90,000
ft2
Annual Production 124,800
units
Production Hrs. Annual 3,120
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $29,677 820,926
kWh
Electricity Demand $14,900 262
kW-mo/yr
Electricity Fees $5,447 -
LPG $30,071 7,453
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $19,550 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,509

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $1,289 $62 $902
21,102
kWh
$387
-
kW-mo/yr
- - -
02 2.4231: Reduce the pressure of compressed air to the minimum required $1,752 $40 $1,229
28,722
kWh
$523
-
kW-mo/yr
- - -
03 2.4133: Use most efficient type of electric motors $949 $1,518 $665
15,533
kWh
$284
-
kW-mo/yr
- - -
04 2.2511: Insulate bare equipment $960 $300 - - $960
-
MMBtu
- -
05 3.5316: Contract a wood pallet recycling company $2,600 - - - - $2,600
-
lb
-
06 4.432: Cross-train personnel to avoid lost time $8,000 $2,000 - - - - $8,000
07 4.421: Modify current incentive program $4,000 $700 - - - - $4,000
TOTAL RECOMMENDED $19,550 $4,620 $2,796
65,357
kWh
$1,194
-
kW-mo/yr
$960
-
MMBtu
$2,600
-
lb
$12,000
TOTAL IMPLEMENTED $4,509 $1,818 $665
15,533
kWh
$284
-
kW-mo/yr
$960
-
MMBtu
$2,600
-
lb
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs