Assessment Year | 1999 |
---|---|
Principal Product | Mobile Air Storage Tanks |
NAICS |
n/a
|
SIC | 3443: Fabricated Plate Work (Boiler Shops) |
Sales Range | $10 M to 50M |
# of Employees | 40 |
Plant Area |
90,000
ft2
|
Annual Production | 124,800
units
|
Production Hrs. Annual | 3,120
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $29,677 | 820,926 |
kWh
|
$0.036 |
Electricity Demand | $14,900 | 262 |
kW-mo/yr
|
$56.87 |
Electricity Fees | $5,447 | - |
|
- |
LPG | $30,071 | 7,453 |
MMBtu
|
$4.03 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $19,550 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $4,509 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4221: Install compressor air intakes in coolest locations | $1,289 | $62 |
$902
21,102
kWh
|
$387
-
kW-mo/yr
|
- | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,752 | $40 |
$1,229
28,722
kWh
|
$523
-
kW-mo/yr
|
- | - | - | |
03 | 2.4133: Use most efficient type of electric motors | $949 | $1,518 |
$665
15,533
kWh
|
$284
-
kW-mo/yr
|
- | - | - | |
04 | 2.2511: Insulate bare equipment | $960 | $300 | - | - |
$960
-
MMBtu
|
- | - | |
05 | 3.5316: Contract a wood pallet recycling company | $2,600 | - | - | - | - |
$2,600
-
lb
|
- | |
06 | 4.432: Cross-train personnel to avoid lost time | $8,000 | $2,000 | - | - | - | - | $8,000 | |
07 | 4.421: Modify current incentive program | $4,000 | $700 | - | - | - | - | $4,000 | |
TOTAL RECOMMENDED | $19,550 | $4,620 |
$2,796
65,357
kWh
|
$1,194
-
kW-mo/yr
|
$960
-
MMBtu
|
$2,600
-
lb
|
$12,000 | ||
TOTAL IMPLEMENTED | $4,509 | $1,818 |
$665
15,533
kWh
|
$284
-
kW-mo/yr
|
$960
-
MMBtu
|
$2,600
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs