Assessment Year | 2004 |
---|---|
Principal Product | Aerospace blind rivots |
NAICS | 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing |
SIC | 3452: Bolts, Nuts, Screws, Rivets, and Washers |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
286,000
ft2
|
Annual Production | 360,000,000
pieces
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $879,143 | 10,611,410 |
kWh
|
$0.083 |
Electricity Demand | $245,308 | 22,645 |
kW-mo/yr
|
$10.83 |
Natural Gas | $111,461 | 15,064 |
MMBtu
|
$7.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $103,770 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,878 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $78,560 | $164,000 |
$92,521
1,117,410
kWh
|
$23,653
-
kW-mo/yr
|
$(-37,614.0)
-
MMBtu
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,934 | $4,300 |
$6,934
83,741
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,757 | $920 |
$4,022
48,579
kWh
|
$735
-
kW-mo/yr
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,407 | $3,423 |
$4,407
53,228
kWh
|
- | - | - | |
05 | 2.2511: Insulate bare equipment | $1,332 | $369 | - | - |
$1,332
-
MMBtu
|
- | |
06 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $7,780 | $18,500 | - | - | - |
$7,780
-
lb
|
|
TOTAL RECOMMENDED | $103,770 | $191,512 |
$107,884
1,302,958
kWh
|
$24,388
-
kW-mo/yr
|
$(-36,282.0)
-
MMBtu
|
$7,780
-
lb
|
||
TOTAL IMPLEMENTED | $23,878 | $27,143 |
$15,363
185,548
kWh
|
$735
-
kW-mo/yr
|
- |
$7,780
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs