Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Aerospace blind rivots
NAICS 332722: Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452: Bolts, Nuts, Screws, Rivets, and Washers
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 286,000
ft2
Annual Production 360,000,000
pieces
Production Hrs. Annual 8,568
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $879,143 10,611,410
kWh
Electricity Demand $245,308 22,645
kW-mo/yr
Natural Gas $111,461 15,064
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $103,770 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,878

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $78,560 $164,000 $92,521
1,117,410
kWh
$23,653
-
kW-mo/yr
$(-37,614.0)
-
MMBtu
-
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,934 $4,300 $6,934
83,741
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,757 $920 $4,022
48,579
kWh
$735
-
kW-mo/yr
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,407 $3,423 $4,407
53,228
kWh
- - -
05 2.2511: Insulate bare equipment $1,332 $369 - - $1,332
-
MMBtu
-
06 3.6193: Install equipment (eg compactor) to reduce disposal costs $7,780 $18,500 - - - $7,780
-
lb
TOTAL RECOMMENDED $103,770 $191,512 $107,884
1,302,958
kWh
$24,388
-
kW-mo/yr
$(-36,282.0)
-
MMBtu
$7,780
-
lb
TOTAL IMPLEMENTED $23,878 $27,143 $15,363
185,548
kWh
$735
-
kW-mo/yr
- $7,780
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs