ITAC Assessment: MO0263
ITAC logo
ITAC Assessment: MO0263
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Plastic Injected Molding - Telephone Parts
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area 91,000
ft2
Annual Production 460,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $288,774 5,985,053
kWh
Electricity Demand $28,256 1,308
kW-mo/yr
Electricity Fees $39,062 -
Natural Gas $9,429 1,942
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $81,666 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,233

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $1,337 $100 $1,257
22,860
kWh
$80
-
kW-mo/yr
- - -
02 2.4239: Eliminate or reduce compressed air usage $696 $80 $653
12,016
kWh
$43
-
kW-mo/yr
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,679 $5,556 $2,677
48,945
kWh
$2,002
-
kW-mo/yr
- - -
04 3.5315: Lease / purchase baler; sell cardboard to recycler $19,200 - - - $19,200
-
lb
- -
05 4.441: Install automatic packing equipment $54,600 $695 - - - $54,600 -
06 2.7135: Install occupancy sensors $1,154 $1,696 - - - - $1,154
TOTAL RECOMMENDED $81,666 $8,127 $4,587
83,821
kWh
$2,125
-
kW-mo/yr
$19,200
-
lb
$54,600 $1,154
TOTAL IMPLEMENTED $21,233 $180 $1,910
34,876
kWh
$123
-
kW-mo/yr
$19,200
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs