ITAC Assessment: MO0260
ITAC logo
ITAC Assessment: MO0260
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Ball Valves and Pneumatic Couplings
NAICS
n/a
SIC 3494: Valves and Pipe Fittings, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 140
Plant Area 91,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,916 1,926,436
kWh
Electricity Demand $13,492 549
kW-mo/yr
Electricity Fees $7,709 -
Natural Gas $9,314 1,867
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,051,090 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,207

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Increase in Production Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $8,388 $10,745 $7,427
129,250
kWh
$961
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $5,158 $6,558 $4,526
78,839
kWh
$632
-
kW-mo/yr
- - -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,591 - $1,338
23,447
kWh
$253
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $1,308 $205 $1,190
20,809
kWh
$118
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,545 $80 $2,314
40,445
kWh
$231
-
kW-mo/yr
- - -
06 2.4314: Use synthetic lubricant $710 $174 $646
11,137
kWh
$64
-
kW-mo/yr
- - -
07 3.7198: Reduce / eliminate use of disposable product $1,440 $1,440 - - $1,440
-
lb
- -
08 4.425: Eliminate/reduce redundant inspections $6,630 $1,895 - - - $6,630 -
09 4.651: Install back-up equipment $1,023,320 $184,320 - - - - $1,023,320
TOTAL RECOMMENDED $1,051,090 $205,417 $17,441
303,927
kWh
$2,259
-
kW-mo/yr
$1,440
-
lb
$6,630 $1,023,320
TOTAL IMPLEMENTED $10,207 $8,377 $7,700
134,232
kWh
$1,067
-
kW-mo/yr
$1,440
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs