Assessment Year | 1999 |
---|---|
Principal Product | Jacketed Rifle and Pistol Projectiles |
NAICS |
n/a
|
SIC | 3482: Small Arms Ammunition |
Sales Range | $10 M to 50M |
# of Employees | 84 |
Plant Area |
43,000
ft2
|
Annual Production | 116,200,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $72,287 | 1,648,007 |
kWh
|
$0.044 |
Electricity Demand | $10,354 | 418 |
kW-mo/yr
|
$24.77 |
Electricity Fees | $11,846 | - |
|
- |
Natural Gas | $29,630 | 5,219 |
MMBtu
|
$5.68 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $73,210 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $67,918 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,911 | $4,897 |
$3,584
70,340
kWh
|
$327
-
kW-mo/yr
|
- | - | |
02 | 2.4133: Use most efficient type of electric motors | $2,257 | $3,392 |
$2,009
39,273
kWh
|
$248
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $1,116 | $49 |
$1,032
20,223
kWh
|
$84
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,256 | $40 |
$1,162
22,860
kWh
|
$94
-
kW-mo/yr
|
- | - | |
05 | 4.111: Add equipment/ operators to reduce production bottleneck | $1,750 | $450 |
$1,668
19,637
kWh
|
$82
-
kW-mo/yr
|
- | - | |
06 | 3.6192: Use a less expensive method of waste removal | $2,460 | - | - | - |
$2,460
-
lb
|
- | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $60,000 | $27,500 | - | - | - | $60,000 | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $460 | $345 |
$165
3,224
kWh
|
$10
-
kW-mo/yr
|
- | $285 | |
TOTAL RECOMMENDED | $73,210 | $36,673 |
$9,620
175,557
kWh
|
$845
-
kW-mo/yr
|
$2,460
-
lb
|
$60,285 | ||
TOTAL IMPLEMENTED | $67,918 | $36,239 |
$7,261
129,250
kWh
|
$657
-
kW-mo/yr
|
- | $60,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs