ITAC Assessment: MO0257
ITAC logo
ITAC Assessment: MO0257
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Electric Household Appliances
NAICS
n/a
SIC 3634: Electric Housewares and Fans
Sales Range $50
M
to 100
M
# of Employees 450
Plant Area 225,000
ft2
Annual Production 5,200,000
pieces
Production Hrs. Annual 2,450
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,777 3,358,441
kWh
Electricity Demand $25,547 1,101
kW-mo/yr
Electricity Fees $21,720 -
Natural Gas $129,505 37,522
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $79,773 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,773

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,831 - $5,787
110,785
kWh
$1,044
-
kW-mo/yr
- -
02 2.4133: Use most efficient type of electric motors $1,596 - $1,271
24,326
kWh
$325
-
kW-mo/yr
- -
03 2.4221: Install compressor air intakes in coolest locations $2,342 - $1,715
32,825
kWh
$627
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $990 - $735
14,068
kWh
$255
-
kW-mo/yr
- -
05 3.5315: Lease / purchase baler; sell cardboard to recycler $27,000 - - - $27,000
-
lb
-
06 3.5316: Contract a wood pallet recycling company $18,130 - - - $18,130
-
lb
-
07 4.611: Begin a practice of predictive / preventative maintenance $11,004 - - - - $11,004
08 4.422: Utilize outside contracting $11,880 - - - - $11,880
TOTAL RECOMMENDED $79,773 - $9,508
182,004
kWh
$2,251
-
kW-mo/yr
$45,130
-
lb
$22,884
TOTAL IMPLEMENTED $21,773 - $8,773
167,936
kWh
$1,996
-
kW-mo/yr
- $11,004
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs