ITAC Assessment: MO0256
ITAC logo
ITAC Assessment: MO0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Indexing Equipment
NAICS
n/a
SIC 3549: Metalworking Machinery, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 103,400
ft2
Annual Production 321,300
units
Production Hrs. Annual 4,590
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $109,205 2,133,646
kWh
Electricity Demand $12,825 576
kW-mo/yr
Electricity Fees $14,800 -
Natural Gas $18,439 3,709
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $266,631 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,627

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $3,574 $10,069 $3,151
54,220
kWh
$423
-
kW-mo/yr
- - -
02 2.4133: Use most efficient type of electric motors $2,533 $3,290 $2,333
40,152
kWh
$200
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $488 $60 $443
7,620
kWh
$45
-
kW-mo/yr
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $437 - $392
6,741
kWh
$45
-
kW-mo/yr
- - -
05 4.652: Replace existing equipment with more suitable substitutes $400 - - - $400
-
lb
- -
06 4.512: Condense operation into one building $250,000 $125,000 - - - - $250,000
07 3.5248: Separate and recycle scrap metal to foundry or for sale $5,216 - - - - $5,216 -
08 4.611: Begin a practice of predictive / preventative maintenance $2,520 $3,700 - - - $2,520 -
09 2.3134: Shift from daytime to nighttime operation $1,463 - - - - $1,463 -
TOTAL RECOMMENDED $266,631 $142,119 $6,319
108,733
kWh
$713
-
kW-mo/yr
$400
-
lb
$9,199 $250,000
TOTAL IMPLEMENTED $8,627 $17,059 $5,484
94,372
kWh
$623
-
kW-mo/yr
- $2,520 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs