Assessment Year | 1999 |
---|---|
Principal Product | Bearings and Bushings |
NAICS |
n/a
|
SIC | 3568: Mechanical Power Transmission Equipment, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 92 |
Plant Area |
41,500
ft2
|
Annual Production | 300,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $97,096 | 2,789,273 |
kWh
|
$0.035 |
Electricity Demand | $26,823 | 499 |
kW-mo/yr
|
$53.75 |
Electricity Fees | $15,448 | - |
|
- |
Natural Gas | $47,037 | 8,065 |
MMBtu
|
$5.83 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,818 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,901 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $4,142 | $5,326 |
$3,336
82,649
kWh
|
$806
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,507 | $5,843 |
$2,023
50,117
kWh
|
$484
-
kW-mo/yr
|
- | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,044 | $40 |
$1,668
41,325
kWh
|
$376
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,393 | $58 |
$1,124
27,843
kWh
|
$269
-
kW-mo/yr
|
- | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,322 | - |
$1,053
26,084
kWh
|
$269
-
kW-mo/yr
|
- | - | |
06 | 4.652: Replace existing equipment with more suitable substitutes | $63,081 | $12,600 | - | - | - | $63,081 | |
07 | 4.611: Begin a practice of predictive / preventative maintenance | $14,000 | $3,700 | - | - | - | $14,000 | |
08 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $329 | $714 | - | - | $329 | - | |
TOTAL RECOMMENDED | $88,818 | $28,281 |
$9,204
228,018
kWh
|
$2,204
-
kW-mo/yr
|
$329 | $77,081 | ||
TOTAL IMPLEMENTED | $22,901 | $9,124 |
$7,181
177,901
kWh
|
$1,720
-
kW-mo/yr
|
- | $14,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs