ITAC Assessment: MO0252
ITAC logo
ITAC Assessment: MO0252
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Air Filters
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 107
Plant Area 57,600
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,014 1,951,641
kWh
Electricity Demand $23,128 452
kW-mo/yr
Electricity Fees $16,063 -
Natural Gas $15,932 2,480
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $126,737 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $118,282

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 4.126: Install sensors to detect defects $101,434 $15,624 - - - - $101,434
02 4.513: Re-arrange equipment layout to reduce labor costs $5,875 $10,000 - - - $5,875 -
03 4.652: Replace existing equipment with more suitable substitutes $422 $34 - - - $422 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,134 $4,647 $1,776
36,049
kWh
$358
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $3,315 $53 $2,854
58,030
kWh
$461
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $3,006 $40 $2,597
52,755
kWh
$409
-
kW-mo/yr
- - -
07 2.4133: Use most efficient type of electric motors $2,877 $4,372 $2,468
50,117
kWh
$409
-
kW-mo/yr
- - -
08 3.1191: Change procedures / equipment / operating conditions $7,674 $3,340 - - $7,674
-
gal
- -
TOTAL RECOMMENDED $126,737 $38,110 $9,695
196,951
kWh
$1,637
-
kW-mo/yr
$7,674
-
gal
$6,297 $101,434
TOTAL IMPLEMENTED $118,282 $33,370 $2,468
50,117
kWh
$409
-
kW-mo/yr
$7,674
-
gal
$6,297 $101,434
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings