| Assessment Year | 1999 |
|---|---|
| Principal Product | Aeration Equipment |
| NAICS |
n/a
|
| SIC | 3589: Service Industry Machinery, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 36 |
| Plant Area |
51,000
ft2
|
| Annual Production | 260,000
pieces
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $12,786 | 297,479 |
kWh
|
$0.043 |
| Electricity Demand | $7,430 | 156 |
kW-mo/yr
|
$47.63 |
| Electricity Fees | $2,932 | - |
|
- |
| Natural Gas | $8,702 | 1,512 |
MMBtu
|
$5.76 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $5,470 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $2,982 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.652: Replace existing equipment with more suitable substitutes | $815 | $587 | - | - | - | $815 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,026 | $5,915 |
$1,548
29,308
kWh
|
$478
-
kW-mo/yr
|
- | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $141 | $104 |
$93
1,758
kWh
|
$48
-
kW-mo/yr
|
- | - | |
| 04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $(-62.0) | $622 |
$(-62.0)
(-1,172)
kWh
|
- | - | - | |
| 05 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $840 | - | - | - |
$840
-
lb
|
- | |
| 06 | 3.5316: Contract a wood pallet recycling company | $1,710 | - | - | - |
$1,710
-
lb
|
- | |
| TOTAL RECOMMENDED | $5,470 | $7,228 |
$1,579
29,894
kWh
|
$526
-
kW-mo/yr
|
$2,550
-
lb
|
$815 | ||
| TOTAL IMPLEMENTED | $2,982 | $6,606 |
$1,641
31,066
kWh
|
$526
-
kW-mo/yr
|
- | $815 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs