Assessment Year | 1999 |
---|---|
Principal Product | Plastic Parts, Coils, and Harnesses Used In Acceptors, Chang |
NAICS |
n/a
|
SIC | 3999: Manufacturing Industries, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 426 |
Plant Area |
95,000
ft2
|
Annual Production | 800,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $301,720 | 7,639,508 |
kWh
|
$0.039 |
Electricity Demand | $118,140 | 1,794 |
kW-mo/yr
|
$65.85 |
Electricity Fees | $23,250 | - |
|
- |
LPG | $41,538 | 9,108 |
MMBtu
|
$4.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $169,483 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $165,581 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.445: Install equipment to move product | $102,637 | $208,000 | - | - | - | $102,637 | - | |
02 | 4.454: Modify startup/shutdown times | $59,125 | - | - | - | - | - | $59,125 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,629 | $6,698 |
$1,582
37,222
kWh
|
$1,047
-
kW-mo/yr
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,190 | $80 |
$729
17,292
kWh
|
$461
-
kW-mo/yr
|
- | - | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,669 | $2,622 |
$1,010
23,740
kWh
|
$659
-
kW-mo/yr
|
- | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $1,255 | $2,497 |
$860
20,223
kWh
|
$395
-
kW-mo/yr
|
- | - | - | |
07 | 3.1175: Use a different or recycled raw material | $978 | - | - | - |
$978
-
lb
|
- | - | |
TOTAL RECOMMENDED | $169,483 | $219,897 |
$4,181
98,477
kWh
|
$2,562
-
kW-mo/yr
|
$978
-
lb
|
$102,637 | $59,125 | ||
TOTAL IMPLEMENTED | $165,581 | $214,778 |
$2,311
54,514
kWh
|
$1,508
-
kW-mo/yr
|
- | $102,637 | $59,125 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs