ITAC Assessment: MO0248
ITAC logo
ITAC Assessment: MO0248
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Plastic Parts, Coils, and Harnesses Used In Acceptors, Chang
NAICS
n/a
SIC 3999: Manufacturing Industries, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 426
Plant Area 95,000
ft2
Annual Production 800,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $301,720 7,639,508
kWh
Electricity Demand $118,140 1,794
kW-mo/yr
Electricity Fees $23,250 -
LPG $41,538 9,108
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $169,483 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $165,581

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 4.445: Install equipment to move product $102,637 $208,000 - - - $102,637 -
02 4.454: Modify startup/shutdown times $59,125 - - - - - $59,125
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,629 $6,698 $1,582
37,222
kWh
$1,047
-
kW-mo/yr
- - -
04 2.4221: Install compressor air intakes in coolest locations $1,190 $80 $729
17,292
kWh
$461
-
kW-mo/yr
- - -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,669 $2,622 $1,010
23,740
kWh
$659
-
kW-mo/yr
- - -
06 2.4133: Use most efficient type of electric motors $1,255 $2,497 $860
20,223
kWh
$395
-
kW-mo/yr
- - -
07 3.1175: Use a different or recycled raw material $978 - - - $978
-
lb
- -
TOTAL RECOMMENDED $169,483 $219,897 $4,181
98,477
kWh
$2,562
-
kW-mo/yr
$978
-
lb
$102,637 $59,125
TOTAL IMPLEMENTED $165,581 $214,778 $2,311
54,514
kWh
$1,508
-
kW-mo/yr
- $102,637 $59,125
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings