| Assessment Year | 2022 |
|---|---|
| Principal Product | Printing Paper |
| NAICS | 323111: Commercial Printing (except Screen and Books) |
| SIC | 2752: Commercial Printing, Lithographic |
| Sales Range | $10 M to 50M |
| # of Employees | 45 |
| Plant Area |
40,000
ft2
|
| Annual Production | 7,400
units
|
| Production Hrs. Annual | 5,355
hrs
|
| Location (State) | Alabama |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $95,207 | 925,560 |
kWh
|
$0.10 |
| Electricity Demand | $21,442 | 3,883 |
kW-mo/yr
|
$5.52 |
| Electricity Fees | $10,008 | - |
|
- |
| TOTAL YEARLY COSTS | $126,657 | |||
| RECOMMENDED SAVINGS* | $14,584 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $4,647 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7111: Reduce illumination to minimum necessary levels | $1,430 | $1,362 |
$1,162
11,297
kWh
|
$155
-
kW-mo/yr
|
$113 | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $241 | $540 |
$186
1,805
kWh
|
$36
-
kW-mo/yr
|
$19 | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,671 | $1,000 |
$1,380
13,412
kWh
|
$159
-
kW-mo/yr
|
$132 | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,976 | $5,978 |
$2,536
24,652
kWh
|
$205
-
kW-mo/yr
|
$235 | |
| 05 | 2.7272: Install heat pipes / raise cooling setpoint | $8,266 | $1,440 |
$7,613
74,010
kWh
|
- | $653 | |
| TOTAL RECOMMENDED | $14,584 | $10,320 |
$12,877
125,176
kWh
|
$555
-
kW-mo/yr
|
$1,152 | ||
| TOTAL IMPLEMENTED | $4,647 | $6,978 |
$3,916
38,064
kWh
|
$364
-
kW-mo/yr
|
$367 | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs