ITAC Assessment: UA0256
ITAC logo
ITAC Assessment: UA0256
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Printing Paper
NAICS 323111: Commercial Printing (except Screen and Books)
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 40,000
ft2
Annual Production 7,400
units
Production Hrs. Annual 5,355
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,207 925,560
kWh
Electricity Demand $21,442 3,883
kW-mo/yr
Electricity Fees $10,008 -
TOTAL YEARLY COSTS $126,657
RECOMMENDED SAVINGS* $14,584 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,647

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7111: Reduce illumination to minimum necessary levels $1,430 $1,362 $1,162
11,297
kWh
$155
-
kW-mo/yr
$113
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $241 $540 $186
1,805
kWh
$36
-
kW-mo/yr
$19
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,671 $1,000 $1,380
13,412
kWh
$159
-
kW-mo/yr
$132
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,976 $5,978 $2,536
24,652
kWh
$205
-
kW-mo/yr
$235
05 2.7272: Install heat pipes / raise cooling setpoint $8,266 $1,440 $7,613
74,010
kWh
- $653
TOTAL RECOMMENDED $14,584 $10,320 $12,877
125,176
kWh
$555
-
kW-mo/yr
$1,152
TOTAL IMPLEMENTED $4,647 $6,978 $3,916
38,064
kWh
$364
-
kW-mo/yr
$367
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs