ITAC Assessment: MO0246
ITAC logo
ITAC Assessment: MO0246
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Frozen and Non-Frozen Food Products
NAICS
n/a
SIC 2038: Frozen Specialties, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 100
Plant Area 42,000
ft2
Annual Production 50,000,000
lb
Production Hrs. Annual 5,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $194,674 4,301,290
kWh
Electricity Demand $17,181 883
kW-mo/yr
Electricity Fees $29,350 -
Natural Gas $88,152 18,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,925 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,197

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 3.2176: Increase use of automation $31,680 $7,000 - - - - $31,680
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,027 $8,072 $2,793
53,634
kWh
$234
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $3,419 $277 $3,205
61,547
kWh
$214
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,019 $40 $961
18,464
kWh
$58
-
kW-mo/yr
- - -
05 2.4133: Use most efficient type of electric motors $3,732 $4,699 $3,479
66,823
kWh
$253
-
kW-mo/yr
- - -
06 3.4151: Minimize water usage $3,728 $11,000 - - $3,728
-
gal
- -
07 3.5315: Lease / purchase baler; sell cardboard to recycler $1,320 - - - - $1,320
-
lb
-
TOTAL RECOMMENDED $47,925 $31,088 $10,438
200,468
kWh
$759
-
kW-mo/yr
$3,728
-
gal
$1,320
-
lb
$31,680
TOTAL IMPLEMENTED $44,197 $20,088 $10,438
200,468
kWh
$759
-
kW-mo/yr
- $1,320
-
lb
$31,680
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs