ITAC Assessment: UD0730
ITAC logo
ITAC Assessment: UD0730
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Caddy Fasteners
NAICS 339993: Fastener, Button, Needle, and Pin Manufacturing
SIC 3965: Fasteners, Buttons, Needles, and Pins
Sales Range $10
M
to 50
M
# of Employees 224
Plant Area 170,000
ft2
Annual Production 336,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $311,251 6,080,813
kWh
Electricity Demand $160,822 11,604
kW-mo/yr
Natural Gas $386,197 41,720
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,589 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,921

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $40,357 $3,600 $9,840
519,920
kWh
$30,517
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $29,475 $7,200 $6,971
366,912
kWh
$21,620
-
kW-mo/yr
- - - $884
03 2.2312: Minimize non-essential material in heat treatment process $13,381 $25,000 - - - $13,381
-
MMBtu
- -
04 2.2514: Cover open tanks $12,069 $2,170 - - - $11,149
-
MMBtu
$920
-
Tgal
-
05 2.2414: Use waste heat from hot flue gases to preheat $6,473 $12,880 - - - $6,473
-
MMBtu
- -
06 2.2511: Insulate bare equipment $5,769 $4,350 - - - $5,769
-
MMBtu
- -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,376 $1,000 $1,067
56,160
kWh
$3,309
-
kW-mo/yr
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $4,232 $9,916 $588
30,925
kWh
$3,644
-
kW-mo/yr
- - - -
09 2.3511: Use plant owned transformers or lease transformers $3,480 $1,500 - - $3,480 - - -
10 2.2212: Use minimum safe oven ventilation $3,222 $150 - - - $3,222
-
MMBtu
- -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,840 $945 $670
35,320
kWh
$2,170
-
kW-mo/yr
- - - -
12 2.7314: Reduce ventilation air $1,408 - - - - $1,408
-
MMBtu
- -
13 2.2514: Cover open tanks $315 - - - - $296
-
MMBtu
$19
-
Tgal
-
14 2.7135: Install occupancy sensors $192 $600 $192
10,109
kWh
- - - - -
TOTAL RECOMMENDED $127,589 $69,311 $19,328
1,019,346
kWh
$61,260
-
kW-mo/yr
$3,480 $41,698
-
MMBtu
$939
-
Tgal
$884
TOTAL IMPLEMENTED $17,921 $24,741 $2,325
122,405
kWh
$9,123
-
kW-mo/yr
- $6,473
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs