Assessment Year | 1999 |
---|---|
Principal Product | Hard and Soft Wood Lumber |
NAICS |
n/a
|
SIC | 2421: Sawmills and Planing Mills, General |
Sales Range | $1 M to 5M |
# of Employees | 18 |
Plant Area |
535,603
ft2
|
Annual Production | 5,000
thousand feet
|
Production Hrs. Annual | 2,210
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $23,509 | 516,413 |
kWh
|
$0.046 |
Electricity Demand | $24,264 | 3,244 |
kW-mo/yr
|
$7.48 |
Electricity Fees | $9,828 | - |
|
- |
Fuel Oil #2 | $25,675 | 5,513 |
MMBtu
|
$4.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $88,497 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $6,707 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $69,817 | $255,600 |
$26,059
332,943
kWh
|
$1,655
-
kW-mo/yr
|
$25,675
-
MMBtu
|
$16,428
-
lb
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,001 | $12,150 |
$5,001
63,892
kWh
|
- | - | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,594 | $24,400 |
$3,064
37,808
kWh
|
$530
-
kW-mo/yr
|
- | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $5,481 | $24,400 |
$4,679
57,737
kWh
|
$802
-
kW-mo/yr
|
- | - | |
05 | 2.4322: Use or replace with energy efficient substitutes | $2,304 | $6,042 |
$2,304
28,429
kWh
|
- | - | - | |
06 | 2.2136: Install / repair insulation on steam lines | $1,706 | $2,000 | - | - |
$1,706
-
MMBtu
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $594 | - |
$594
7,327
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $88,497 | $324,592 |
$41,701
528,136
kWh
|
$2,987
-
kW-mo/yr
|
$27,381
-
MMBtu
|
$16,428
-
lb
|
||
TOTAL IMPLEMENTED | $6,707 | $14,150 |
$5,001
63,892
kWh
|
- |
$1,706
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Fuel Oil #2 Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs