ITAC Assessment: MA0449
ITAC logo
ITAC Assessment: MA0449
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Hard and Soft Wood Lumber
NAICS
n/a
SIC 2421: Sawmills and Planing Mills, General
Sales Range $1
M
to 5
M
# of Employees 18
Plant Area 535,603
ft2
Annual Production 5,000
thousand feet
Production Hrs. Annual 2,210
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $23,509 516,413
kWh
Electricity Demand $24,264 3,244
kW-mo/yr
Electricity Fees $9,828 -
Fuel Oil #2 $25,675 5,513
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,497 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,707

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings
01 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $69,817 $255,600 $26,059
332,943
kWh
$1,655
-
kW-mo/yr
$25,675
-
MMBtu
$16,428
-
lb
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,001 $12,150 $5,001
63,892
kWh
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,594 $24,400 $3,064
37,808
kWh
$530
-
kW-mo/yr
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,481 $24,400 $4,679
57,737
kWh
$802
-
kW-mo/yr
- -
05 2.4322: Use or replace with energy efficient substitutes $2,304 $6,042 $2,304
28,429
kWh
- - -
06 2.2136: Install / repair insulation on steam lines $1,706 $2,000 - - $1,706
-
MMBtu
-
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $594 - $594
7,327
kWh
- - -
TOTAL RECOMMENDED $88,497 $324,592 $41,701
528,136
kWh
$2,987
-
kW-mo/yr
$27,381
-
MMBtu
$16,428
-
lb
TOTAL IMPLEMENTED $6,707 $14,150 $5,001
63,892
kWh
- $1,706
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs