ITAC Assessment: MO0241
ITAC logo
ITAC Assessment: MO0241
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Aluminum Die Castings
NAICS
n/a
SIC 3363: Aluminum Die-Castings
Sales Range $1
M
to 5
M
# of Employees 70
Plant Area 27,500
ft2
Annual Production 1,164,537
lb
Production Hrs. Annual 6,120
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $81,307 1,846,424
kWh
Electricity Demand $10,273 408
kW-mo/yr
Electricity Fees $12,137 -
Natural Gas $89,276 27,713
MMBtu
LPG $3,796 266
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,018 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,501

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.432: Cross-train personnel to avoid lost time $20 $4,500 - - - - $20
02 2.7142: Utilize higher efficiency lamps and/or ballasts $129 $207 $104
2,052
kWh
$25
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,139 $1,761 $1,038
20,516
kWh
$101
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,639 $80 $1,513
29,894
kWh
$126
-
kW-mo/yr
- - -
05 2.4221: Install compressor air intakes in coolest locations $1,004 $57 $727
14,361
kWh
$277
-
kW-mo/yr
- - -
06 2.4133: Use most efficient type of electric motors $3,209 $4,403 $3,159
62,427
kWh
$50
-
kW-mo/yr
- - -
07 2.4314: Use synthetic lubricant $795 $370 - - $795
-
gal
- -
08 3.5315: Lease / purchase baler; sell cardboard to recycler $83 - - - - $83
-
lb
-
TOTAL RECOMMENDED $8,018 $11,378 $6,541
129,250
kWh
$579
-
kW-mo/yr
$795
-
gal
$83
-
lb
$20
TOTAL IMPLEMENTED $5,501 $10,928 $5,028
99,356
kWh
$453
-
kW-mo/yr
- - $20
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs