Assessment Year | 1998 |
---|---|
Principal Product | Toroidal Transformers |
NAICS |
n/a
|
SIC | 3612: Power, Distribution, and Specialty Transformers |
Sales Range | $5 M to 10M |
# of Employees | 93 |
Plant Area |
24,000
ft2
|
Annual Production | 120,000
pieces
|
Production Hrs. Annual | 2,066
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $32,460 | 804,220 |
kWh
|
$0.040 |
Electricity Demand | $6,406 | 190 |
kW-mo/yr
|
$33.72 |
Electricity Fees | $2,644 | - |
|
- |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $40,175 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $36,911 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.511: Expand operations into unused space | $36,414 | $15,250 | - | - | - | $36,414 | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $897 | $2,225 |
$627
14,361
kWh
|
$270
-
kW-mo/yr
|
- | - | |
03 | 2.2437: Recover waste heat from equipment | $310 | $343 |
$243
5,569
kWh
|
$67
-
kW-mo/yr
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $187 | $40 |
$153
3,517
kWh
|
$34
-
kW-mo/yr
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $149 | $47 |
$115
2,638
kWh
|
$34
-
kW-mo/yr
|
- | - | |
06 | 3.1163: Use plastic pallets instead of wood | $1,835 | $3,015 | - | - |
$1,835
-
lb
|
- | |
07 | 3.7196: Use re-usable filters | $383 | $410 | - | - |
$383
-
lb
|
- | |
TOTAL RECOMMENDED | $40,175 | $21,330 |
$1,138
26,085
kWh
|
$405
-
kW-mo/yr
|
$2,218
-
lb
|
$36,414 | ||
TOTAL IMPLEMENTED | $36,911 | $15,633 |
$396
9,086
kWh
|
$101
-
kW-mo/yr
|
- | $36,414 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs