ITAC Assessment: MO0240
ITAC logo
ITAC Assessment: MO0240
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Toroidal Transformers
NAICS
n/a
SIC 3612: Power, Distribution, and Specialty Transformers
Sales Range $5
M
to 10
M
# of Employees 93
Plant Area 24,000
ft2
Annual Production 120,000
pieces
Production Hrs. Annual 2,066
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $32,460 804,220
kWh
Electricity Demand $6,406 190
kW-mo/yr
Electricity Fees $2,644 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $40,175 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,911

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.511: Expand operations into unused space $36,414 $15,250 - - - $36,414
02 2.7142: Utilize higher efficiency lamps and/or ballasts $897 $2,225 $627
14,361
kWh
$270
-
kW-mo/yr
- -
03 2.2437: Recover waste heat from equipment $310 $343 $243
5,569
kWh
$67
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $187 $40 $153
3,517
kWh
$34
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $149 $47 $115
2,638
kWh
$34
-
kW-mo/yr
- -
06 3.1163: Use plastic pallets instead of wood $1,835 $3,015 - - $1,835
-
lb
-
07 3.7196: Use re-usable filters $383 $410 - - $383
-
lb
-
TOTAL RECOMMENDED $40,175 $21,330 $1,138
26,085
kWh
$405
-
kW-mo/yr
$2,218
-
lb
$36,414
TOTAL IMPLEMENTED $36,911 $15,633 $396
9,086
kWh
$101
-
kW-mo/yr
- $36,414
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs