Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Curing, Smoking, and Processing Red Meat and Poultry Product
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 240
Plant Area 201,500
ft2
Annual Production 10,500,000
lb
Production Hrs. Annual 2,210
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $290,294 6,600,528
kWh
Electricity Demand $91,546 1,414
kW-mo/yr
Electricity Fees $20,198 -
Natural Gas $56,713 11,416
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,155

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 3.1191: Change procedures / equipment / operating conditions $12,814 $7,799 - - - $12,814
02 4.611: Begin a practice of predictive / preventative maintenance $1,192 $2,700 - - - $1,192
03 2.4226: Use / purchase optimum sized compressor $253 $663 - - - $253
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,198 $7,665 $2,579
54,807
kWh
$1,619
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,541 $40 $1,282
27,257
kWh
$259
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $1,035 $47 $841
17,878
kWh
$194
-
kW-mo/yr
- -
07 2.4133: Use most efficient type of electric motors $663 $1,328 $469
9,965
kWh
$194
-
kW-mo/yr
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $2,827 $1,400 $2,827
60,082
kWh
- - -
09 3.5315: Lease / purchase baler; sell cardboard to recycler $7,920 - - - $7,920
-
lb
-
TOTAL RECOMMENDED $32,443 $21,642 $7,998
169,989
kWh
$2,266
-
kW-mo/yr
$7,920
-
lb
$14,259
TOTAL IMPLEMENTED $20,155 $20,202 $3,889
82,650
kWh
$2,007
-
kW-mo/yr
- $14,259
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs