ITAC Assessment: MO0233
ITAC logo
ITAC Assessment: MO0233
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Expandable Polystyrene Packaging Materials/Patterns for Cast
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 85,000
ft2
Annual Production 1,749,166
lb
Production Hrs. Annual 6,240
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $102,865 2,393,025
kWh
Electricity Demand $30,006 505
kW-mo/yr
Electricity Fees $7,187 -
Natural Gas $241,658 59,951
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $117,580 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $23,664

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.445: Install equipment to move product $42,310 $87,250 - - - $42,310
02 4.611: Begin a practice of predictive / preventative maintenance $1,376 $4,000 - - - $1,376
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,020 $4,307 $1,604
34,877
kWh
$416
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $1,847 $297 $1,550
33,705
kWh
$297
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $1,384 $120 $1,146
24,912
kWh
$238
-
kW-mo/yr
- -
06 2.4314: Use synthetic lubricant $1,014 $666 $836
18,171
kWh
$178
-
kW-mo/yr
- -
07 2.4133: Use most efficient type of electric motors $8,362 $10,741 $6,996
152,110
kWh
$1,366
-
kW-mo/yr
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $10,892 $2,000 $10,892
236,811
kWh
- - -
09 3.5311: Recover and reuse waste material $48,375 $2,000 - - $48,375
-
lb
-
10 3.1131: Use mechanical stripping methods - $6,000 - - - -
TOTAL RECOMMENDED $117,580 $117,381 $23,024
500,586
kWh
$2,495
-
kW-mo/yr
$48,375
-
lb
$43,686
TOTAL IMPLEMENTED $23,664 $27,714 $20,328
441,969
kWh
$1,960
-
kW-mo/yr
- $1,376
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs