ITAC Assessment: MO0228
ITAC logo
ITAC Assessment: MO0228
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Various types of Envelopes
NAICS
n/a
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 275
Plant Area 101,000
ft2
Annual Production 2,500,000,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $316,804 6,802,755
kWh
Electricity Demand $30,292 1,220
kW-mo/yr
Electricity Fees $28,987 -
Natural Gas $20,864 3,643
MMBtu
LPG $6,841 453
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $162,762 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,812

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $2,820 $3,700 - - - $2,820
02 4.514: Re-arrange equipment layout to reduce handling costs $6,875 $9,000 - - - $6,875
03 2.7142: Utilize higher efficiency lamps and/or ballasts $2,275 $5,648 $1,952
38,394
kWh
$323
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $958 $1,308 $834
16,413
kWh
$124
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $129 $207 $104
2,052
kWh
$25
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $3,303 $128 $3,055
60,082
kWh
$248
-
kW-mo/yr
- -
07 2.4133: Use most efficient type of electric motors $5,051 $6,765 $4,679
92,028
kWh
$372
-
kW-mo/yr
- -
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,276 - $1,177
23,154
kWh
$99
-
kW-mo/yr
- -
09 3.1163: Use plastic pallets instead of wood $138,000 $129,420 - - $138,000
-
lb
-
10 3.1175: Use a different or recycled raw material $2,075 - - - $2,075
-
lb
-
TOTAL RECOMMENDED $162,762 $156,176 $11,801
232,123
kWh
$1,191
-
kW-mo/yr
$140,075
-
lb
$9,695
TOTAL IMPLEMENTED $15,812 $17,756 $11,801
232,123
kWh
$1,191
-
kW-mo/yr
- $2,820
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings