ITAC Assessment: MO0224
ITAC logo
ITAC Assessment: MO0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Chemical Distribution and Refrigeration Valves
NAICS
n/a
SIC 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 86,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 6,456
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $151,011 3,051,290
kWh
Electricity Demand $16,255 660
kW-mo/yr
Electricity Fees $21,747 -
Natural Gas $66,635 12,624
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $60,672

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.432: Cross-train personnel to avoid lost time $7,972 $20,000 - - - $7,972
02 4.711: Initiate a total quality management program $26,928 $50,000 - - - $26,928
03 4.514: Re-arrange equipment layout to reduce handling costs $4,300 $10,000 - - - $4,300
04 4.611: Begin a practice of predictive / preventative maintenance $3,660 $3,700 - - - $3,660
05 2.7142: Utilize higher efficiency lamps and/or ballasts $9,640 $18,440 $8,970
158,558
kWh
$670
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $486 $1,042 $410
7,327
kWh
$76
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $199 $345 $189
3,224
kWh
$10
-
kW-mo/yr
- -
08 2.4221: Install compressor air intakes in coolest locations $984 $61 $925
16,413
kWh
$59
-
kW-mo/yr
- -
09 2.4131: Size electric motors for peak operating efficiency $5,439 $10,327 $4,922
87,046
kWh
$517
-
kW-mo/yr
- -
10 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,064 - $995
17,585
kWh
$69
-
kW-mo/yr
- -
11 3.1191: Change procedures / equipment / operating conditions $1,200 $747 - - $1,200
-
lb
-
TOTAL RECOMMENDED $61,872 $114,662 $16,411
290,153
kWh
$1,401
-
kW-mo/yr
$1,200
-
lb
$42,860
TOTAL IMPLEMENTED $60,672 $113,915 $16,411
290,153
kWh
$1,401
-
kW-mo/yr
- $42,860
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs