Assessment Year | 1998 |
---|---|
Principal Product | Chemical Distribution and Refrigeration Valves |
NAICS |
n/a
|
SIC | 3564: Industrial and Commercial Fans and Blowers and Air Purification Equipment |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
86,000
ft2
|
Annual Production | 1,000,000
pieces
|
Production Hrs. Annual | 6,456
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $151,011 | 3,051,290 |
kWh
|
$0.049 |
Electricity Demand | $16,255 | 660 |
kW-mo/yr
|
$24.63 |
Electricity Fees | $21,747 | - |
|
- |
Natural Gas | $66,635 | 12,624 |
MMBtu
|
$5.28 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $61,872 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $60,672 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.432: Cross-train personnel to avoid lost time | $7,972 | $20,000 | - | - | - | $7,972 | |
02 | 4.711: Initiate a total quality management program | $26,928 | $50,000 | - | - | - | $26,928 | |
03 | 4.514: Re-arrange equipment layout to reduce handling costs | $4,300 | $10,000 | - | - | - | $4,300 | |
04 | 4.611: Begin a practice of predictive / preventative maintenance | $3,660 | $3,700 | - | - | - | $3,660 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,640 | $18,440 |
$8,970
158,558
kWh
|
$670
-
kW-mo/yr
|
- | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $486 | $1,042 |
$410
7,327
kWh
|
$76
-
kW-mo/yr
|
- | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $199 | $345 |
$189
3,224
kWh
|
$10
-
kW-mo/yr
|
- | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $984 | $61 |
$925
16,413
kWh
|
$59
-
kW-mo/yr
|
- | - | |
09 | 2.4131: Size electric motors for peak operating efficiency | $5,439 | $10,327 |
$4,922
87,046
kWh
|
$517
-
kW-mo/yr
|
- | - | |
10 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,064 | - |
$995
17,585
kWh
|
$69
-
kW-mo/yr
|
- | - | |
11 | 3.1191: Change procedures / equipment / operating conditions | $1,200 | $747 | - | - |
$1,200
-
lb
|
- | |
TOTAL RECOMMENDED | $61,872 | $114,662 |
$16,411
290,153
kWh
|
$1,401
-
kW-mo/yr
|
$1,200
-
lb
|
$42,860 | ||
TOTAL IMPLEMENTED | $60,672 | $113,915 |
$16,411
290,153
kWh
|
$1,401
-
kW-mo/yr
|
- | $42,860 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs