ITAC Assessment: MO0220
ITAC logo
ITAC Assessment: MO0220
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Custom Sewing-Tents, Awning, Backpacks, and Covers
NAICS
n/a
SIC 2394: Canvas and Related Products
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 160,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,845 1,465,416
kWh
Electricity Demand $6,277 370
kW-mo/yr
Electricity Fees $8,670 -
Natural Gas $41,879 7,993
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,879 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $30,231

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.432: Cross-train personnel to avoid lost time $13,800 $25,000 - - - $13,800
02 4.522: Modify storage space to avoid rental of a warehouse $8,000 $15,000 - - - $8,000
03 2.4231: Reduce the pressure of compressed air to the minimum required $516 $80 $419
12,016
kWh
$97
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $39 $51 $32
879
kWh
$7
-
kW-mo/yr
- -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $76 - $62
1,758
kWh
$14
-
kW-mo/yr
- -
06 3.5313: Increase amount of waste recovered for resale $7,800 $3,040 - - $7,800
-
lb
-
07 3.7196: Use re-usable filters $1,648 $2,231 - - $1,648
-
lb
-
TOTAL RECOMMENDED $31,879 $45,402 $513
14,653
kWh
$118
-
kW-mo/yr
$9,448
-
lb
$21,800
TOTAL IMPLEMENTED $30,231 $43,171 $513
14,653
kWh
$118
-
kW-mo/yr
$7,800
-
lb
$21,800
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs