ITAC Assessment: MO0217
ITAC logo
ITAC Assessment: MO0217
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Plastic Packaging
NAICS
n/a
SIC 2673: Plastics, Foil, and Coated Paper Bags
Sales Range $50
M
to 100
M
# of Employees 255
Plant Area 147,000
ft2
Annual Production 10,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $363,348 22,080,598
kWh
Electricity Demand $524,082 6,730
kW-mo/yr
Electricity Fees $30,788 -
Natural Gas $208,511 37,095
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $250,414 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $168,002

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.711: Initiate a total quality management program $46,952 $50,000 - - - $46,952
02 4.611: Begin a practice of predictive / preventative maintenance $13,495 $3,500 - - - $13,495
03 4.432: Cross-train personnel to avoid lost time $8,200 $20,000 - - - $8,200
04 4.514: Re-arrange equipment layout to reduce handling costs $7,350 $12,500 - - - $7,350
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,125 $8,080 $3,311
185,522
kWh
$1,814
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $2,151 $3,156 $1,388
77,667
kWh
$763
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $4,301 $116 $2,829
158,558
kWh
$1,472
-
kW-mo/yr
- -
08 2.4231: Reduce the pressure of compressed air to the minimum required $4,458 $80 $2,986
158,558
kWh
$1,472
-
kW-mo/yr
- -
09 2.4133: Use most efficient type of electric motors $1,440 $1,048 $513
26,084
kWh
$927
-
kW-mo/yr
- -
10 2.2437: Recover waste heat from equipment $82,412 $230,000 - - $82,412
-
lb
-
11 3.5316: Contract a wood pallet recycling company $74,530 $10,000 - - $74,530
-
lb
-
TOTAL RECOMMENDED $250,414 $338,480 $11,027
606,389
kWh
$6,448
-
kW-mo/yr
$156,942
-
lb
$75,997
TOTAL IMPLEMENTED $168,002 $108,480 $11,027
606,389
kWh
$6,448
-
kW-mo/yr
$74,530
-
lb
$75,997
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs