| Assessment Year | 1997 |
|---|---|
| Principal Product | Corrugated Containers |
| NAICS |
n/a
|
| SIC | 2653: Corrugated and Solid Fiber Boxes |
| Sales Range | $10 M to 50M |
| # of Employees | 165 |
| Plant Area |
201,222
ft2
|
| Annual Production | 600,000,000
thousand feet
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $97,627 | 4,054,220 |
kWh
|
$0.024 |
| Electricity Demand | $54,534 | 817 |
kW-mo/yr
|
$66.75 |
| Electricity Fees | $6,765 | - |
|
- |
| Natural Gas | $184,748 | 51,801 |
MMBtu
|
$3.57 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $273,760 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $184,960 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.711: Initiate a total quality management program | $83,859 | $35,000 | - | - | - | $83,859 | |
| 02 | 4.432: Cross-train personnel to avoid lost time | $9,090 | $25,000 | - | - | - | $9,090 | |
| 03 | 4.514: Re-arrange equipment layout to reduce handling costs | $10,061 | $25,000 | - | - | - | $10,061 | |
| 04 | 4.611: Begin a practice of predictive / preventative maintenance | $9,830 | $3,500 | - | - | - | $9,830 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,149 | $2,282 |
$635
24,619
kWh
|
$514
-
kW-mo/yr
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $677 | $1,088 |
$403
15,533
kWh
|
$274
-
kW-mo/yr
|
- | - | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $154 | $483 |
$121
4,689
kWh
|
$33
-
kW-mo/yr
|
- | - | |
| 08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,241 | $80 |
$1,587
61,547
kWh
|
$654
-
kW-mo/yr
|
- | - | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $731 | $68 |
$517
20,223
kWh
|
$214
-
kW-mo/yr
|
- | - | |
| 10 | 2.4133: Use most efficient type of electric motors | $3,648 | $5,100 |
$2,580
100,234
kWh
|
$1,068
-
kW-mo/yr
|
- | - | |
| 11 | 3.1163: Use plastic pallets instead of wood | $63,520 | $49,140 | - | - |
$63,520
-
lb
|
- | |
| 12 | 4.522: Modify storage space to avoid rental of a warehouse | $88,800 | $100,000 | - | - |
$88,800
-
lb
|
- | |
| TOTAL RECOMMENDED | $273,760 | $246,741 |
$5,843
226,845
kWh
|
$2,757
-
kW-mo/yr
|
$152,320
-
lb
|
$112,840 | ||
| TOTAL IMPLEMENTED | $184,960 | $146,741 |
$5,843
226,845
kWh
|
$2,757
-
kW-mo/yr
|
$63,520
-
lb
|
$112,840 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs