ITAC Assessment: MO0213
ITAC logo
ITAC Assessment: MO0213
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Railway Rolling Stock and Parts
NAICS
n/a
SIC 3743: Railroad Equipment
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 165,000
ft2
Annual Production 1,225
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,526 4,310,375
kWh
Electricity Demand $61,602 931
kW-mo/yr
Electricity Fees $11,609 -
Natural Gas $18,133 3,980
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $205,951 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,944

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.432: Cross-train personnel to avoid lost time $12,142 $20,000 - - - - $12,142
02 4.514: Re-arrange equipment layout to reduce handling costs $8,250 $10,000 - - - - $8,250
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,811 $10,944 $2,494
91,735
kWh
$1,317
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,904 $1,046 $1,242
45,721
kWh
$662
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $142 $414 $109
4,103
kWh
$33
-
kW-mo/yr
- - -
06 2.4133: Use most efficient type of electric motors $1,326 $3,383 $903
33,118
kWh
$423
-
kW-mo/yr
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $6,372 $80 $4,341
159,730
kWh
$2,031
-
kW-mo/yr
- - -
08 2.4221: Install compressor air intakes in coolest locations $964 $180 $31
7,327
kWh
$933
-
kW-mo/yr
- - -
09 2.4321: Upgrade obsolete equipment $166,090 $85,000 - - - $166,090
-
lb
-
10 2.4321: Upgrade obsolete equipment $4,950 $6,000 - - $4,950
-
gal
- -
TOTAL RECOMMENDED $205,951 $137,047 $9,120
341,734
kWh
$5,399
-
kW-mo/yr
$4,950
-
gal
$166,090
-
lb
$20,392
TOTAL IMPLEMENTED $34,944 $40,509 $6,486
238,569
kWh
$3,116
-
kW-mo/yr
$4,950
-
gal
- $20,392
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs