Assessment Year | 1997 |
---|---|
Principal Product | Railway Rolling Stock and Parts |
NAICS |
n/a
|
SIC | 3743: Railroad Equipment |
Sales Range | $10 M to 50M |
# of Employees | 110 |
Plant Area |
165,000
ft2
|
Annual Production | 1,225
pieces
|
Production Hrs. Annual | 5,200
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $105,526 | 4,310,375 |
kWh
|
$0.024 |
Electricity Demand | $61,602 | 931 |
kW-mo/yr
|
$66.17 |
Electricity Fees | $11,609 | - |
|
- |
Natural Gas | $18,133 | 3,980 |
MMBtu
|
$4.56 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $205,951 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $34,944 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 4.432: Cross-train personnel to avoid lost time | $12,142 | $20,000 | - | - | - | - | $12,142 | |
02 | 4.514: Re-arrange equipment layout to reduce handling costs | $8,250 | $10,000 | - | - | - | - | $8,250 | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,811 | $10,944 |
$2,494
91,735
kWh
|
$1,317
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,904 | $1,046 |
$1,242
45,721
kWh
|
$662
-
kW-mo/yr
|
- | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $142 | $414 |
$109
4,103
kWh
|
$33
-
kW-mo/yr
|
- | - | - | |
06 | 2.4133: Use most efficient type of electric motors | $1,326 | $3,383 |
$903
33,118
kWh
|
$423
-
kW-mo/yr
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $6,372 | $80 |
$4,341
159,730
kWh
|
$2,031
-
kW-mo/yr
|
- | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $964 | $180 |
$31
7,327
kWh
|
$933
-
kW-mo/yr
|
- | - | - | |
09 | 2.4321: Upgrade obsolete equipment | $166,090 | $85,000 | - | - | - |
$166,090
-
lb
|
- | |
10 | 2.4321: Upgrade obsolete equipment | $4,950 | $6,000 | - | - |
$4,950
-
gal
|
- | - | |
TOTAL RECOMMENDED | $205,951 | $137,047 |
$9,120
341,734
kWh
|
$5,399
-
kW-mo/yr
|
$4,950
-
gal
|
$166,090
-
lb
|
$20,392 | ||
TOTAL IMPLEMENTED | $34,944 | $40,509 |
$6,486
238,569
kWh
|
$3,116
-
kW-mo/yr
|
$4,950
-
gal
|
- | $20,392 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs