| Assessment Year | 1997 |
|---|---|
| Principal Product | Pillows and Cushions |
| NAICS |
n/a
|
| SIC | 2392: House furnishing, Except Curtains and Draperies |
| Sales Range | $10 M to 50M |
| # of Employees | 73 |
| Plant Area |
64,000
ft2
|
| Annual Production | 3,600,000
pieces
|
| Production Hrs. Annual | 2,340
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $28,412 | 916,764 |
kWh
|
$0.031 |
| Electricity Demand | $26,350 | 540 |
kW-mo/yr
|
$48.80 |
| Electricity Fees | $3,542 | - |
|
- |
| Natural Gas | $11,410 | 1,691 |
MMBtu
|
$6.75 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $44,654 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $36,921 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 4.711: Initiate a total quality management program | $20,957 | $25,000 | - | - | - | $20,957 | |
| 02 | 4.432: Cross-train personnel to avoid lost time | $9,392 | $20,000 | - | - | - | $9,392 | |
| 03 | 4.514: Re-arrange equipment layout to reduce handling costs | $5,760 | $12,500 | - | - | - | $5,760 | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,185 | $3,600 |
$736
21,102
kWh
|
$449
-
kW-mo/yr
|
- | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $81 | $207 |
$71
2,052
kWh
|
$10
-
kW-mo/yr
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,021 | $222 |
$611
17,585
kWh
|
$410
-
kW-mo/yr
|
- | - | |
| 07 | 2.4131: Size electric motors for peak operating efficiency | $812 | $2,221 |
$509
14,654
kWh
|
$303
-
kW-mo/yr
|
- | - | |
| 08 | 3.5311: Recover and reuse waste material | $5,328 | - | - | - |
$5,328
-
lb
|
- | |
| 09 | 3.5311: Recover and reuse waste material | $118 | $30 | - | - |
$118
-
lb
|
- | |
| TOTAL RECOMMENDED | $44,654 | $63,780 |
$1,927
55,393
kWh
|
$1,172
-
kW-mo/yr
|
$5,446
-
lb
|
$36,109 | ||
| TOTAL IMPLEMENTED | $36,921 | $59,721 |
$509
14,654
kWh
|
$303
-
kW-mo/yr
|
- | $36,109 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs