ITAC Assessment: MO0208
ITAC logo
ITAC Assessment: MO0208
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Pillows and Cushions
NAICS
n/a
SIC 2392: House furnishing, Except Curtains and Draperies
Sales Range $10
M
to 50
M
# of Employees 73
Plant Area 64,000
ft2
Annual Production 3,600,000
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $28,412 916,764
kWh
Electricity Demand $26,350 540
kW-mo/yr
Electricity Fees $3,542 -
Natural Gas $11,410 1,691
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,654 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,921

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.711: Initiate a total quality management program $20,957 $25,000 - - - $20,957
02 4.432: Cross-train personnel to avoid lost time $9,392 $20,000 - - - $9,392
03 4.514: Re-arrange equipment layout to reduce handling costs $5,760 $12,500 - - - $5,760
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,185 $3,600 $736
21,102
kWh
$449
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $81 $207 $71
2,052
kWh
$10
-
kW-mo/yr
- -
06 2.4221: Install compressor air intakes in coolest locations $1,021 $222 $611
17,585
kWh
$410
-
kW-mo/yr
- -
07 2.4131: Size electric motors for peak operating efficiency $812 $2,221 $509
14,654
kWh
$303
-
kW-mo/yr
- -
08 3.5311: Recover and reuse waste material $5,328 - - - $5,328
-
lb
-
09 3.5311: Recover and reuse waste material $118 $30 - - $118
-
lb
-
TOTAL RECOMMENDED $44,654 $63,780 $1,927
55,393
kWh
$1,172
-
kW-mo/yr
$5,446
-
lb
$36,109
TOTAL IMPLEMENTED $36,921 $59,721 $509
14,654
kWh
$303
-
kW-mo/yr
- $36,109
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs