ITAC Assessment: LM0047
ITAC logo
ITAC Assessment: LM0047
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product aluminum die castings
NAICS 331523: Nonferrous Metal Die-Casting Foundries
SIC 3363: Aluminum Die-Castings
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 88,000
ft2
Annual Production 3,100,530
lb
Production Hrs. Annual 2,400
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $323,667 3,154,259
kWh
Electricity Demand $78,942 7,908
kW-mo/yr
Electricity Fees $4,533 -
Natural Gas $184,421 42,297
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $500,257 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $488,805

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $9,457 $6,432 $6,617
59,864
kWh
$2,840
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,703 $200 $3,485
31,542
kWh
$1,998
-
kW-mo/yr
- $(-780.0) -
03 2.4221: Install compressor air intakes in coolest locations $997 $228 $634
5,737
kWh
$363
-
kW-mo/yr
- - -
04 2.4239: Eliminate or reduce compressed air usage $370 $525 $235
2,140
kWh
$135
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $837 $1,365 $714
5,180
kWh
$123
-
kW-mo/yr
- - -
06 2.2414: Use waste heat from hot flue gases to preheat $1,158 $1,222 - - $1,158
-
MMBtu
- -
07 4.625: Develop standard operating procedures $250,000 $26,500 - - - $250,000 -
08 4.611: Begin a practice of predictive / preventative maintenance $138,235 $2,000 - - - $138,235 -
09 4.122: Develop standard procedures to improve internal yields $31,500 $2,000 - - - - $31,500
10 4.311: Schedule deliveries according to demand $63,000 $5,000 - - - - $63,000
TOTAL RECOMMENDED $500,257 $45,472 $11,685
104,463
kWh
$5,459
-
kW-mo/yr
$1,158
-
MMBtu
$387,455 $94,500
TOTAL IMPLEMENTED $488,805 $36,453 $4,354
39,419
kWh
$2,496
-
kW-mo/yr
- $387,455 $94,500
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs