ITAC Assessment: MO0207
ITAC logo
ITAC Assessment: MO0207
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Food Service Equipment
NAICS
n/a
SIC 3430:
Sales Range $10
M
to 50
M
# of Employees 157
Plant Area 62,500
ft2
Annual Production 192,000
pieces
Production Hrs. Annual 6,292
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,826 1,427,022
kWh
Electricity Demand $8,994 286
kW-mo/yr
Electricity Fees $8,994 -
Natural Gas $17,082 2,981
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,531 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,066

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $5,391 $3,500 - - - - $5,391
02 4.514: Re-arrange equipment layout to reduce handling costs $5,000 $12,500 - - - - $5,000
03 2.7142: Utilize higher efficiency lamps and/or ballasts $780 $2,032 $687
13,482
kWh
$93
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,526 $1,222 $6,011
117,819
kWh
$515
-
kW-mo/yr
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $144 $276 $136
2,638
kWh
$8
-
kW-mo/yr
- - -
06 2.4231: Reduce the pressure of compressed air to the minimum required $541 $40 $464
9,086
kWh
$77
-
kW-mo/yr
- - -
07 2.4221: Install compressor air intakes in coolest locations $553 $50 $473
9,379
kWh
$80
-
kW-mo/yr
- - -
08 2.4133: Use most efficient type of electric motors $1,288 $1,976 $1,171
22,860
kWh
$117
-
kW-mo/yr
- - -
09 2.4321: Upgrade obsolete equipment $55,000 $85,000 - - $55,000
-
gal
- -
10 3.5315: Lease / purchase baler; sell cardboard to recycler $15,308 $4,860 - - - $15,308
-
lb
-
TOTAL RECOMMENDED $90,531 $111,456 $8,942
175,264
kWh
$890
-
kW-mo/yr
$55,000
-
gal
$15,308
-
lb
$10,391
TOTAL IMPLEMENTED $34,066 $24,108 $7,655
150,058
kWh
$712
-
kW-mo/yr
- $15,308
-
lb
$10,391
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs