ITAC Assessment: MO0197
ITAC logo
ITAC Assessment: MO0197
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Automotive Mufflers and Exhaust Pipes
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 495
Plant Area 120,000
ft2
Annual Production 4,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $888,207 18,401,524
kWh
Electricity Demand $95,517 4,838
kW-mo/yr
Natural Gas $43,780 10,064
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $67,954 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $67,954

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
01 4.711: Initiate a total quality management program $16,060 $15,000 - - - $16,060
02 4.611: Begin a practice of predictive / preventative maintenance $9,288 $7,500 - - - $9,288
03 4.514: Re-arrange equipment layout to reduce handling costs $4,800 $10,000 - - - $4,800
04 3.5311: Recover and reuse waste material $13,642 - - - $13,642
-
gal
-
05 3.7312: Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $1,052 $3,000 - - $1,052
-
gal
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,247 $4,192 $3,000
62,720
kWh
$247
-
kW-mo/yr
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,358 $1,718 $1,255
26,084
kWh
$103
-
kW-mo/yr
- -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $303 - $289
6,155
kWh
$14
-
kW-mo/yr
- -
09 2.4221: Install compressor air intakes in coolest locations $4,128 $337 $3,765
78,546
kWh
$363
-
kW-mo/yr
- -
10 2.4131: Size electric motors for peak operating efficiency $14,076 $35,980 $12,763
266,120
kWh
$1,313
-
kW-mo/yr
- -
TOTAL RECOMMENDED $67,954 $77,727 $21,072
439,625
kWh
$2,040
-
kW-mo/yr
$14,694
-
gal
$30,148
TOTAL IMPLEMENTED $67,954 $77,727 $21,072
439,625
kWh
$2,040
-
kW-mo/yr
$14,694
-
gal
$30,148
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs