Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Heavy Duty Cables
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 425
Plant Area 70,000
ft2
Annual Production 12,500,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,214 3,233,587
kWh
Electricity Demand $82,517 8,763
kW-mo/yr
Natural Gas $29,310 5,389
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $36,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,337

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 3.5313: Increase amount of waste recovered for resale $19,791 - - - $19,791
-
lb
02 2.4231: Reduce the pressure of compressed air to the minimum required $2,931 $80 $1,557
54,513
kWh
$1,374
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $2,161 $264 $1,149
40,152
kWh
$1,012
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $1,918 $4,576 $914
31,946
kWh
$1,004
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $931 $1,858 $478
16,706
kWh
$453
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $135 - $105
3,810
kWh
$30
-
kW-mo/yr
-
07 2.4133: Use most efficient type of electric motors $7,603 $21,012 $5,277
184,936
kWh
$2,326
-
kW-mo/yr
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $589 - $408
14,361
kWh
$181
-
kW-mo/yr
-
TOTAL RECOMMENDED $36,059 $27,790 $9,888
346,424
kWh
$6,380
-
kW-mo/yr
$19,791
-
lb
TOTAL IMPLEMENTED $13,337 $27,710 $8,331
291,911
kWh
$5,006
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs