ITAC Assessment: MA0034
ITAC logo
ITAC Assessment: MA0034
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product WOOL & SYNTHETIC YARN
NAICS
n/a
SIC 2284: Thread Mills
Sales Range $10
M
to 50
M
# of Employees 135
Plant Area
n/a
Annual Production 4,700,000
lb
Production Hrs. Annual 6,500
hrs
Location (State) Rhode Island

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $325,178 3,521,688
kWh
Natural Gas $175 18
MMBtu
Fuel Oil #6 $59,501 11,631
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,643 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $944

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
01 2.4221: Install compressor air intakes in coolest locations $944 $325 $944
10,258
kWh
- -
02 2.2511: Insulate bare equipment $4,879 $470 $5,436
58,910
kWh
- $(-557.0)
-
MMBtu
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $44,783 $14,362 $57,854
626,612
kWh
$(-13,071.0)
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $20,809 $43,813 $20,809
226,260
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $203 $161 $203
2,345
kWh
- -
06 2.4133: Use most efficient type of electric motors $1,025 $1,040 $1,025
11,137
kWh
- -
TOTAL RECOMMENDED $72,643 $60,171 $86,271
935,522
kWh
$(-13,071.0)
-
MMBtu
$(-557.0)
-
MMBtu
TOTAL IMPLEMENTED $944 $325 $944
10,258
kWh
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs