| Assessment Year | 1996 |
|---|---|
| Principal Product | Brake/Light-Duty Cables |
| NAICS |
n/a
|
| SIC | 3315: Steel Wiredrawing and Steel Nails and Spikes |
| Sales Range | $10 M to 50M |
| # of Employees | 350 |
| Plant Area |
98,100
ft2
|
| Annual Production | 8,400,000
pieces
|
| Production Hrs. Annual | 6,000
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $104,281 | 3,710,727 |
kWh
|
$0.028 |
| Electricity Demand | $94,750 | 9,692 |
kW-mo/yr
|
$9.78 |
| Natural Gas | $47,791 | 8,999 |
MMBtu
|
$5.31 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $23,013 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,725 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,051 | $3,760 |
$976
34,877
kWh
|
$1,075
-
kW-mo/yr
|
- | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $945 | $1,527 |
$462
16,413
kWh
|
$483
-
kW-mo/yr
|
- | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,753 | $264 |
$1,196
42,497
kWh
|
$1,557
-
kW-mo/yr
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,976 | - |
$1,121
39,859
kWh
|
$855
-
kW-mo/yr
|
- | |
| 05 | 3.5313: Increase amount of waste recovered for resale | $15,288 | - | - | - |
$15,288
-
lb
|
|
| TOTAL RECOMMENDED | $23,013 | $5,551 |
$3,755
133,646
kWh
|
$3,970
-
kW-mo/yr
|
$15,288
-
lb
|
||
| TOTAL IMPLEMENTED | $7,725 | $5,551 |
$3,755
133,646
kWh
|
$3,970
-
kW-mo/yr
|
- | ||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs