ITAC Assessment: MO0194
ITAC logo
ITAC Assessment: MO0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Brake/Light-Duty Cables
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 98,100
ft2
Annual Production 8,400,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $104,281 3,710,727
kWh
Electricity Demand $94,750 9,692
kW-mo/yr
Natural Gas $47,791 8,999
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,013 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,725

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,051 $3,760 $976
34,877
kWh
$1,075
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $945 $1,527 $462
16,413
kWh
$483
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $2,753 $264 $1,196
42,497
kWh
$1,557
-
kW-mo/yr
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,976 - $1,121
39,859
kWh
$855
-
kW-mo/yr
-
05 3.5313: Increase amount of waste recovered for resale $15,288 - - - $15,288
-
lb
TOTAL RECOMMENDED $23,013 $5,551 $3,755
133,646
kWh
$3,970
-
kW-mo/yr
$15,288
-
lb
TOTAL IMPLEMENTED $7,725 $5,551 $3,755
133,646
kWh
$3,970
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs