ITAC Assessment: MO0193
ITAC logo
ITAC Assessment: MO0193
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Automatic Pull-Cable Parts
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $1
M
to 5
M
# of Employees 500
Plant Area 10,500
ft2
Annual Production 2,000
ton
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $34,699 598,769
kWh
Electricity Demand $3,178 1,485
kW-mo/yr
Natural Gas $5,897 849
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $54,498 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,943

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 3.1162: Use less wasteful packaging $50,000 $94,219 - - $50,000
-
lb
02 2.4221: Install compressor air intakes in coolest locations $788 $90 $753
12,896
kWh
$35
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $476 $40 $455
7,913
kWh
$21
-
kW-mo/yr
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $684 $840 $644
11,137
kWh
$40
-
kW-mo/yr
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $342 $274 $321
5,569
kWh
$21
-
kW-mo/yr
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $142 - $136
2,345
kWh
$6
-
kW-mo/yr
-
07 2.4133: Use most efficient type of electric motors $1,917 $3,722 $1,832
31,653
kWh
$85
-
kW-mo/yr
-
08 2.4111: Utilize energy-efficient belts and other improved mechanisms $149 - $143
2,345
kWh
$6
-
kW-mo/yr
-
TOTAL RECOMMENDED $54,498 $99,185 $4,284
73,858
kWh
$214
-
kW-mo/yr
$50,000
-
lb
TOTAL IMPLEMENTED $52,943 $99,055 $2,797
48,359
kWh
$146
-
kW-mo/yr
$50,000
-
lb
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs