ITAC Assessment: MO0190
ITAC logo
ITAC Assessment: MO0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Automotive Sealants and Adhesives
NAICS
n/a
SIC 2891: Adhesives and Sealants
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 60,000
ft2
Annual Production 180,000,000
pieces
Production Hrs. Annual 5,750
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $202,598 3,990,035
kWh
Natural Gas $9,906 2,517
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,206 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $70,062

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $335 $675 $335
6,741
kWh
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $918 $2,088 $918
18,171
kWh
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $187 $270 $187
3,810
kWh
- - -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,457 - $1,457
28,722
kWh
- - -
05 2.4133: Use most efficient type of electric motors $8,432 $20,208 $8,432
166,178
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $1,629 $125 $1,629
32,239
kWh
- - -
07 2.4231: Reduce the pressure of compressed air to the minimum required $2,515 $40 $2,515
49,531
kWh
- - -
08 4.211: Consider use / purchase of bulk materials where possible $58,733 $15,000 - $143
-
lb
$1,200 $57,390
TOTAL RECOMMENDED $74,206 $38,406 $15,473
305,392
kWh
$143
-
lb
$1,200 $57,390
TOTAL IMPLEMENTED $70,062 $38,241 $11,329
223,622
kWh
$143
-
lb
$1,200 $57,390
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs