Assessment Year | 1996 |
---|---|
Principal Product | Automotive Sealants and Adhesives |
NAICS |
n/a
|
SIC | 2891: Adhesives and Sealants |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
60,000
ft2
|
Annual Production | 180,000,000
pieces
|
Production Hrs. Annual | 5,750
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $202,598 | 3,990,035 |
kWh
|
$0.051 |
Natural Gas | $9,906 | 2,517 |
MMBtu
|
$3.94 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $74,206 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $70,062 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $335 | $675 |
$335
6,741
kWh
|
- | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $918 | $2,088 |
$918
18,171
kWh
|
- | - | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $187 | $270 |
$187
3,810
kWh
|
- | - | - | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,457 | - |
$1,457
28,722
kWh
|
- | - | - | |
05 | 2.4133: Use most efficient type of electric motors | $8,432 | $20,208 |
$8,432
166,178
kWh
|
- | - | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $1,629 | $125 |
$1,629
32,239
kWh
|
- | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,515 | $40 |
$2,515
49,531
kWh
|
- | - | - | |
08 | 4.211: Consider use / purchase of bulk materials where possible | $58,733 | $15,000 | - |
$143
-
lb
|
$1,200 | $57,390 | |
TOTAL RECOMMENDED | $74,206 | $38,406 |
$15,473
305,392
kWh
|
$143
-
lb
|
$1,200 | $57,390 | ||
TOTAL IMPLEMENTED | $70,062 | $38,241 |
$11,329
223,622
kWh
|
$143
-
lb
|
$1,200 | $57,390 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs