Assessment Year | 1996 |
---|---|
Principal Product | Automotive Brake Cables |
NAICS |
n/a
|
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 407 |
Plant Area |
100,000
ft2
|
Annual Production | 9,500,000
pieces
|
Production Hrs. Annual | 8,064
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $160,421 | 3,434,056 |
kWh
|
$0.047 |
Electricity Demand | $16,103 | 7,310 |
kW-mo/yr
|
$2.20 |
Natural Gas | $20,451 | 3,861 |
MMBtu
|
$5.30 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $54,008 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $41,922 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,684 | $3,720 |
$3,482
64,185
kWh
|
$202
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,908 | $8,928 |
$6,505
119,871
kWh
|
$403
-
kW-mo/yr
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $266 | - |
$254
4,689
kWh
|
$12
-
kW-mo/yr
|
- | |
04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $448 | - |
$421
7,913
kWh
|
$27
-
kW-mo/yr
|
- | |
05 | 2.4133: Use most efficient type of electric motors | $8,984 | $15,706 |
$8,459
155,920
kWh
|
$525
-
kW-mo/yr
|
- | |
06 | 2.4221: Install compressor air intakes in coolest locations | $3,270 | $145 |
$3,093
57,151
kWh
|
$177
-
kW-mo/yr
|
- | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,912 | $40 |
$4,648
85,580
kWh
|
$264
-
kW-mo/yr
|
- | |
08 | 3.5313: Increase amount of waste recovered for resale | $25,536 | - | - | - |
$25,536
-
lb
|
|
TOTAL RECOMMENDED | $54,008 | $28,539 |
$26,862
495,309
kWh
|
$1,610
-
kW-mo/yr
|
$25,536
-
lb
|
||
TOTAL IMPLEMENTED | $41,922 | $19,571 |
$15,455
285,169
kWh
|
$931
-
kW-mo/yr
|
$25,536
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs