Assessment Year | 1996 |
---|---|
Principal Product | Men's Work Shoes |
NAICS |
n/a
|
SIC | 3143: Men's Footwear, Except Athletic |
Sales Range | $10 M to 50M |
# of Employees | 320 |
Plant Area |
50,000
ft2
|
Annual Production | 500,000
pieces
|
Production Hrs. Annual | 2,200
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $141,472 | 2,726,846 |
kWh
|
$0.052 |
Electricity Demand | $20,374 | 12,181 |
kW-mo/yr
|
$1.67 |
Natural Gas | $11,787 | 2,432 |
MMBtu
|
$4.85 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $7,898 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,527 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,043 | $5,437 |
$2,784
49,824
kWh
|
$259
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $191 | - |
$187
3,224
kWh
|
$4
-
kW-mo/yr
|
- | |
03 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $484 | - |
$435
7,913
kWh
|
$49
-
kW-mo/yr
|
- | |
04 | 2.4221: Install compressor air intakes in coolest locations | $872 | $360 |
$793
14,361
kWh
|
$79
-
kW-mo/yr
|
- | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,156 | $120 |
$1,052
18,757
kWh
|
$104
-
kW-mo/yr
|
- | |
06 | 2.4314: Use synthetic lubricant | $202 | $416 |
$177
3,224
kWh
|
$25
-
kW-mo/yr
|
- | |
07 | 3.5313: Increase amount of waste recovered for resale | $1,950 | - | - | - |
$1,950
-
lb
|
|
TOTAL RECOMMENDED | $7,898 | $6,333 |
$5,428
97,303
kWh
|
$520
-
kW-mo/yr
|
$1,950
-
lb
|
||
TOTAL IMPLEMENTED | $3,527 | $5,437 |
$3,219
57,737
kWh
|
$308
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs