ITAC Assessment: MO0184
ITAC logo
ITAC Assessment: MO0184
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Suspension Systems and Controls for Truck, Trailer, and Bus
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 90,000
ft2
Annual Production 6,500
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $58,142 1,044,256
kWh
Electricity Demand $17,235 4,596
kW-mo/yr
LPG $21,014 4,206
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,698 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,999

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,231 $1,692 $1,000
17,878
kWh
$231
-
kW-mo/yr
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,387 $4,944 $1,916
34,291
kWh
$471
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $303 - $279
4,982
kWh
$24
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,024 $40 $948
16,999
kWh
$76
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $745 $180 $689
12,309
kWh
$56
-
kW-mo/yr
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $64 - $52
879
kWh
$12
-
kW-mo/yr
-
07 2.4133: Use most efficient type of electric motors $1,317 $3,776 $1,062
19,050
kWh
$255
-
kW-mo/yr
-
08 3.5316: Contract a wood pallet recycling company $825 - - - $825
-
lb
09 3.7131: Use a rag recycle service $802 - - - $802
-
lb
TOTAL RECOMMENDED $8,698 $10,632 $5,946
106,388
kWh
$1,125
-
kW-mo/yr
$1,627
-
lb
TOTAL IMPLEMENTED $4,999 $10,412 $4,030
72,098
kWh
$969
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs