Assessment Year | 1996 |
---|---|
Principal Product | Packaged Aerosols and Fluids |
NAICS |
n/a
|
SIC | 2842: Specialty Cleaning, Polishing, and Sanitation Preparations |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
130,000
ft2
|
Annual Production | 15,000,000
pieces
|
Production Hrs. Annual | 2,496
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $99,613 | 1,740,621 |
kWh
|
$0.057 |
Electricity Demand | $9,795 | 5,330 |
kW-mo/yr
|
$1.84 |
Natural Gas | $35,156 | 8,191 |
MMBtu
|
$4.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,033 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $23,174 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,065 | $1,949 |
$953
16,706
kWh
|
$112
-
kW-mo/yr
|
- | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,658 | $6,064 |
$2,378
41,618
kWh
|
$280
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $320 | - |
$307
5,275
kWh
|
$13
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $3,780 | $160 |
$3,530
61,841
kWh
|
$250
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,871 | $65 |
$2,682
46,893
kWh
|
$189
-
kW-mo/yr
|
- | - | |
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,579 | $100 |
$1,474
25,791
kWh
|
$105
-
kW-mo/yr
|
- | - | |
07 | 2.4235: Remove or close off unneeded compressed air lines | $325 | $60 |
$190
3,224
kWh
|
$135
-
kW-mo/yr
|
- | - | |
08 | 2.4133: Use most efficient type of electric motors | $1,309 | $3,205 |
$1,214
21,102
kWh
|
$95
-
kW-mo/yr
|
- | - | |
09 | 2.6212: Turn off equipment during breaks, reduce operating time | $76 | - |
$44
879
kWh
|
$32
-
kW-mo/yr
|
- | - | |
10 | 4.211: Consider use / purchase of bulk materials where possible | $19,050 | $180 | - | - |
$2,050
-
lb
|
$17,000 | |
TOTAL RECOMMENDED | $33,033 | $11,783 |
$12,772
223,329
kWh
|
$1,211
-
kW-mo/yr
|
$2,050
-
lb
|
$17,000 | ||
TOTAL IMPLEMENTED | $23,174 | $8,253 |
$3,565
62,427
kWh
|
$559
-
kW-mo/yr
|
$2,050
-
lb
|
$17,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs