ITAC Assessment: BD0048
ITAC logo
ITAC Assessment: BD0048
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product PVC piping
NAICS
n/a
SIC 3429: Hardware, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 68
Plant Area 47,600
ft2
Annual Production 65,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,867 8,196,073
kWh
Electricity Demand $108,455 13,529
kW-mo/yr
Electricity Fees $46,322 -
Natural Gas $2,807 756
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings
01 2.4133: Use most efficient type of electric motors $8,216 $21,050 $5,790
221,864
kWh
$2,426
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,615 $300 $2,161
82,943
kWh
$454
-
kW-mo/yr
- -
03 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,167 $3,270 $1,629
62,427
kWh
$538
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $1,408 $300 $1,141
43,669
kWh
$267
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $445 $842 $271
10,258
kWh
$174
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $359 $225 $259
9,965
kWh
$100
-
kW-mo/yr
- -
07 3.4115: Recover and reuse cooling water $13,784 $16,000 - - $13,784
-
Tgal
-
08 3.5316: Contract a wood pallet recycling company $4,680 $370 - - - $4,680
-
lb
09 3.4151: Minimize water usage $2,160 $800 - - $2,160
-
Tgal
-
TOTAL RECOMMENDED $35,834 $43,157 $11,251
431,126
kWh
$3,959
-
kW-mo/yr
$15,944
-
Tgal
$4,680
-
lb
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Solid Waste (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs