ITAC Assessment: UM0026
ITAC logo
ITAC Assessment: UM0026
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product hams, sausages
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $1
M
to 5
M
# of Employees 20
Plant Area 20,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 3,120
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $85,557 801,290
kWh
Natural Gas $30,783 6,163
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,778 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,480

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $215 $305 $215
2,052
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,265 $5,362 $3,265
30,481
kWh
-
03 2.1123: Install automatic stack damper $855 $500 - $855
-
MMBtu
04 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $443 $451 - $443
-
MMBtu
TOTAL RECOMMENDED $4,778 $6,618 $3,480
32,533
kWh
$1,298
-
MMBtu
TOTAL IMPLEMENTED $3,480 $5,667 $3,480
32,533
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs